Loading...
SC-Mockingbird E4-LR 900612The City With A Be ' UTILITY INSPECTION AND LINE TESTING R O, Box478 CoppelI, Texas 75019 214 - 462-0022 Project: ~o~p~u-- EL[~i-32¥ ~6~4-~ Date: ~Z klD~ ~z) Area: Line:~¢~ Diameter: ~" Length: ~ c~ Plan Sheet No: PRESSURE TEST START FINISH Time: --e~ ./~;~.~o Time: Pressure: ~lO ~!/~?~ Pressure: Allowable Leakage Per Day: (ll.&~ gpd) X (.~1 miles of pipe) X (~ inch Diameter) Gallons Lost Per Day: ( z~f Gal. Lost) ~ (f. Hrs. Tested) X 24 Hrs. Passed:/' /~~~~-- Rejected: COM~IENTS: INFILTRATION/EXFILTRATION TEST START FINISH Time: Time: Allowable Leakage Per Day: (250 gpd) X (__miles of Gallons Lost Per Day: ( Gal. Lost) ~ ( Passed: COM~IENTS: pipe).X ( inch Diameter) Hrs. Tested) X 24 Hrs. = Rejected Tested Performed By: Passed or Rejected By: CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR UNDERGROUND PIPING PLANE INSTRUCTIONE TEST DESCRIPTION FLUSHING TESTS Class 200 PVC ~ Ductile C1 51I Me_~hanical ~¥u CNG qPE CONFORMS TO N~PA 94 ,, STANOARD [~YES °"£"'"%oPE. STANOARO C~YES ["""1 a O ~PUSLICWATER []TANKORRESERVOIR []FIREPUMP []YCONN,TOFLANGE&SPIGOT []OPENPIPE