Loading...
CF-Denton Creek Trail-LR040123on D-"a'ttas/FX 75229 DESIGN USED: LMC (1261) 3000 psi WR Air SAMPLING METHOD: ASTM-C172 TEAM CONSULTANTS, INC. 2970 S. Walton Walker, Suite 101 Dallas, Texas (214) 331-4395 CONCRETE PLACEMENT REPORT 75211 DATE: 01/23/2004 REPORT NO: 32 JOB NO: 035225 .lOB TITLE: START UP TIME: 11:00 Denton Creek/Ashbury Manor Hike and Bike Trail ASTM C-31 BEAM TIME TIME OR CYL. BAT(HED UNLOADED SET NOS. LOCATION TRUCK NO. TICKET NO. WATER ADDED ASTM ASTM CUBIC C143 C231 YARDS SLUMP % AIR TEMPERATURE (F°) AMB/~NC REMARKS 10:28 11:30 13 A-l) 12'jogging track, 150' north of existing track, west side of lake REMARKS: -- Ti~ne On: 10:30 Time Off: 12:00 Tech. Time: 1.5 hrs. Trip Charge: 1 lrf CC: Cyl P/U 01/24/2004 9:00 10:00 1.0 hz'. (overtime) 1 ('it_,,, o£ Coppell/John Elias City of Coppcll/LmTy Davis TBG } artners/Tom Woliver 761 7137020 10.0 5.25 5.75 60 58 ( tan