CF-Denton Creek Trail-LR040124 TEAM Consultants, Inc..
Geotechnical, Environmental, Con,vtruction ~qhzI~t'i~z[,s' Testing,
~~ ...... ~ CONCRETE ST~NGTH REPORT
~TM~C-39), (ASTM C-78), (ASTM C-298) OR (TEX-418-A), (TEX-448-A)
~r. Steve Jeske , DATE: 0~/24,2004 REI'ORT NO.: g~33
~e~ke Constp~ct[0n Company JOB NO.: 0~5225 -
Dallas, TX 75229 PRO,CT: Denton CreeL"Ashbm7 Manor
Hike and Bike Trail
Cyl or Slump(in.) Air (%)
Beam Date Date ASTM ASTM
No. Location Break Made (C-143) (C-231)
9- A Southwest corner of'pond 12/29 12/22 4.25 4.0
B by bike trail 12/29 12/22
C 01/19 12/22
D 12/22
Strength
7-Dav 28-Day
!3940)
4800
4870
(psi)
28-Day
Specs.
a'/
REM AP4(S:
Conical fracture on cylinders unless otherwise noted.
Cylinder diameter 6.00" unless otherwise noted.
,~:ea oFcylinder 28.27 sq. in. unless otI~erwise noted.
cc: City of Coppeli Parks,"Joim Elias
C~ty of CoppelI Parks/'Larry Davis
TB(5 Pu~rtners, Tom x,~, oli, er
By:
TEAM Consultants, Inc.
TEAM Consultants, Inc.
Geotechnical, Environmental, Construction 34ateria],~' TFxtin,~,
CONCRETE STRENGTH REPORT
(ASTM C-39), (ASTM C-78), (ASTM C-298) OR (TEX-418-A), (Tt~;X-448-A)
Mr. Steve Jeske DATE: 0~/24/2004 REPORT NO.: 34
Jeske Construction Company JOB NO.: ¢35225
P.O. Box 59025
Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor
,Hike and Bike Trail
Cyl or Slump(in.) Air (%) Strength {psi)
Beam Date Date ASTM ASTM . 28-Day
No. Location Break blade (C-143) (C-231) .7~ 2?~-Dav Specs.
10- A Bike path north of pond, t)1,'20 01/'13 6.25 5.0 1560 ~
B 200~a{allel to Moore St. 0120 01/13 2670
C 02/10 01/'13
DC 02,'10 01/13
PJ2M?d~J<S:
Conical fracture on cvlinders unless othem,ise noted.
Cylinder diameter 6.(}()' unless otherwise noted.
Axea of cylinder 28.27 sq. m. unless otherwise noted.
By:
lrf
cc: City of CoppelI Parks/Jotm Elias
City of' CoppelI Parks/Larry Davis
TEAM Consultants, Inc.
Tiln'./]'¢ '~, oolcv'/