Loading...
ST9304-CS 950510DALLAS COUNTY PUBLIC WORKS May 10, 1995 Mr. Ken Griffin, P.E. Assistant City Manager/City Engineer City of Coppell P O Box 478 255 Parkway Boulevard Coppell, TX 75019 Re: Belt Line Road -- Project No. 490-403.1 / 91-829 (Denton Tap Road to Mac Arthur Boulevard) Intersection Geometry Dear Mr. Griffin: As we discussed May 10, 1995, there are several outstanding issues regarding the intersections along Belt Line Road. Attached is a letter and several pictures from Halff Associates, Inc. of the proposed intersections of Belt Line Road with MacArthur Boulevard, Mockingbird Lane and Moore Road. The County recommends that, as long as safety is not compromised, every effort be made to avoid altering the railroad crossings. If the City of Coppell utilizes free right turn lane standards that differ from the AASHTO standards, the County will see that those City standards are used in the design. As discussed in the pre-design meeting, all construction costs associated with the auxiliary lanes (e.g., free right turn lanes) are to be paid by the City. Dallas County does not agree with Halff Associates' assertion that these intersection details are outside the scope of their contract. Their contract is for the complete design of Belt Line Road and does not preclude the intersections. The County will relate this position, along with your decisions regarding the intersections' geometry, to Halff Associates upon reciept of Coppell's response. Please forward your comments regarding the intersections by May 22, 1995. You may contact me at 653-7151 if you have any questions concerning this project. Sincerely, 11 h. t Engineer Attachments ABB\ABR\JMS 6.0829XINTER S. LTR 411 Elm Street Dallas, Texas 75202 653-7151 Dallas County Public Works 411 Elm Street Dallas. Texas 75202 May 4. 1995 AVO 14111 Attn: Ms. Jill M. Schneberger, P.E. Project Engineer Re: Project 490-403.1/91-829 Dear Ms. Schneberger: As part of the design process, Halff Associates has evaluated the cometry of the MacArthur Boulevard, Mockingbird Lane and Moore Road and d Grapevine Creek Bridge. Please find enclosed sketches of the three intersections with the proposed right turn lane. Our current geometry for the right turn lanes is based on AASHTO Design Classification 'B' which is defined as providing for SU vehicles and permits occasional WB-50 vehicles to turn with slight encroachment on adjacent traffic lanes. Observations regarding impact on the existing railroad crossings are as follows: The flee right from westbound Beltline Road onto northbound Moore Road contains a 115 degree turn. The corresponding AASHTO radii for Design Classification 'B' are 100, 30, and 100 feet for a three center curve, with a 5-foot offset. The face-to-face dimension between the island and inside curb should be 24 feet. Modifications to the railroad ,crossing should not be required for this geometry. 2. The flee right turn from westbound Beltline Road onto northbound Mockingbird Lane will have the same geometry as discussed in Item No. 1 above. Such a design will require extension of the existing railroad crossing approximately 2 feet 4~ \~- to the east. A simple curve with a 70-foot radius .would also encroach upon the crossing. Railroad crossing modifications could be avoided by using a simple curve radius of 60 'feet for the inside curb. However, this would reduce the g C E;IIVE, ""' i ~ANUBCAPE =,RCHiTECTj~E · PLAN% "~ ,NTY D~RECTOR OE P~BLIB WORKS ~t J ,~ / ; ~,d~, Dallas County Public Works May 4. 1995 Page 2 capacity to AASHTO Design Classification 'A' which is defined as providing primarily for passenger vehicles while permitting occasional SU vehicles to turn with restricted clearances. The free right turn lane from westbound Beltline Road onto northbound MacArthur Boulevard is 11 feet wide with an 18-foot (face-to-face) dimension between the island and inside curb lines. The inside curb through the turn is a three centered compound curve with radii of 150. 50. and 150 feet and an offset of 5 feet. The point of tangency of these curves will be approximately 25 t~et north of the existing railroad tracks. As a result. extending the railroad crossing approximately 4 feet to the east will be required. An equivalent 70-foot simple radius curve will also encroach onto the railroad crossing. Either scenario will require relocation of the existing crossing gates and signals. Reducing the capacity to AASHTO Design Classified in 'A' was also explored. The design would also require an extension of the railroad crossing and relocation of the existing crossing gates and signals. The only design which would eliminate these impacts would be to eliminate the proposed free right turn lane. Moore Road and Mockingbird Lane represent intersections of 2-lane collector streets with a major arterial road. As such, AASHTO Classification 'B' turn lanes would be desirable if free right turn lanes are provided. The intersection at MacArthur Boulevard contains two major arterial roadways. If free right turn lanes are provided, it is our opinion that an AASHTO Design Classification 'B' turn lane should be cons'idered as a minimum standard at this location. Please provide Halff Associates with direction regarding the geometry of these right turn lanes. Please be advised that neither the right turn lanes nor railroad crossing modifications were included in the original construction estimate or engineering services proposal. Additionally, the right turn lanes may impact the right-of-way agreements with DART. If the design and coordination of railroad crossing modifications are required, additional engineering fees would be required. We are proceeding with the preliminary design for the project; however, the right turn lane geometry cannot be finalized until this issue is resolved. 51 'R\'IC~'< )RS Dallas County Public Works May 4. 1995 Page 3 At this time, we would like to confirm our direction regarding channel grading at the proposed Grapevine Creek bridge. We have developed grading plans which extend only far enough upstream and downstream to tie into the existing channel, No attempt has been made to provide channelization between the proposed bridge and the existing railroad trestle to the north. Please advise us if this approach is incorrect. TJK/kdh Enclosure Please call if you have any questions or require additional information. Yours very truly, HALFF ASSOCIATES, INC. Thomas J. Kni AVO',141 I I,'~/'PLT05-02JMS 4 .-,y % I C) '~,.,. ~ 4 % % $ / I / f I I I I I I ,F I I I I # # I ! I # · ,t I I I I I I I t I I I / l I / I I · · / I I I / · · iIll I t I t I I I I I I I # I I III trT'~ ,/, t / ms.$(xxr LT) ~-~