First Baptist-LR040121fi&
Construction Materials Testing
and Environmental Consulting
Texas
CMT,
Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 ~vww .texascmt.com
REPORT OF CONCRETE MIX OBSERVA7 ION
Report Date: January 2 l, 2004 Dale Concrete Placed: December 23, 2003
Client: First Baptist Church of Coppell
Project: First Baptist Church of Coppell
Contractor: West Side Construction
Concrete Supplier and Plant: Redi Mix 1
I.ocation of Placement: Paving strip - SW of existing church building
Proicct No 203-0161
MATERIALS sou~c~ ss= ~n~,~¥,, OBSERVATI ON DATA
FBC 154 7 12/30/03 144,580 5,1 l0
FBC 155 28 01.20/04 173,640 6,140
4~
FBC 156 28 01,20/04 184,260
FBC 157 H IIOLD
P, emarks and/or Distribution:
cc¸
Keviowed by: