REPORT OF CONCRETE MIX OBSERVATION
Keport Date: January 5, 2004 Date Concrete Placed: December 5, 2003
Client: First Baptist Church of Coppell
Project: First Baptist Church of Coppell
Contractor: West Side Construction
Concrete Supplier and Plant: Redi Mix 1
Location ol Placement: Paving
Standard 6"x l 2"
Area 2827 Square hlches
Concrete Report No.: 35
Project No.: 203-0161
MATERIALS souse*, ss..,,ch w,. OBSERVATION DATA
Mix Number: 9265 Time Sample Batched: 07:25 am
Time Sampled: 07:50 am
Cement: Sample Locallon: 15' N & 30' E from SW corner ofpa~ing
Fly Ash: Truck/Ticket No: 228/12165 I
Coarse Aggregate: I cmperalurc:
- Concrete Range: 5
Pine Aggregate; Slump Range {roches):
I Time Started: 06:3(I am
2 Time Completed: 06:30 pm
Added Water: 0 gallons Sample Air Content (%): 4%
Total Cubic Yards Placed: 120
Rcquir, d Strenmh (Lbs/sq in h 3.000
FBC 126 7 12/12/03 96,660 3,420
FBC 127 30 01/05/04 155,580 5,500
FBC 128 5'/~" 30 01/05/04 145,300 5,140
FBC t29 H HOLD
CC:
Mr J W. Bales, c/o Karen White - First Baptist Church of Coppcll
Mr Jim Stewart - H [t Architects
Mr James Starling (2) - Starling-Rici.,,rdson Construction
Mr W Stcvcn Price - Datum }]nginccrs
Reviewed by:
Construction Materials Testing
and Environmental Consulting
Wex s
nc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: January 5, 2004 Date Concrete Placed: December 5, 2003
Client: First Baptist Church of Coppell
project: First Baptist Church of Coppell
Contractor: West Side Construction
Concrete Supplier and Plant: Redi Mix 1
Location of Placement: Paving
Standard 6"xl2"
Area 28.27 Square Inches
Concrete ReporlNo: 36
Projecl No.: 203-0161
MATERIALS Souse., ss~, ,~.h ,,. OBSERVATION DATA
Mix Number: 9265 Vmlc Sample Batchcd: 09:15 am
Cmnent: Time Sampled: 09:.12 am
Sample Location: 20' N & 30' g ['rom cleclric post al center
Required Slrcnulh (I.hs/sqm 3.000
FBC 130 7 12/12/03 91,400 3,230
FBC 131 30 01/05/04 132,700 4,690
FBC 132 5V=" 30 01/05/04 127,260 4,500
FBC 133 H HOLD
TestMcthodsUlflized FlactureRe~ular Cylinders Made By: EA
Remarks and/or Dislribution:
Texas C}4T, Inc. Roviewed by:
Mr J W. Balcs, c/o Karen White - First Baptist Church of Coppell
Mr Jim Stewart Il Ii Architects
Mr James Starling (2) - Starling-Richardson Consmiction
Mr W Steven Price - Datum Engineers
Construction Materials Testing
and Environmental Consulting
Tex s
CMT,
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OB ,ERVATION
Report Date: January 5, 2004 Dam Concrete Placed: December 5, 2003
Client First Baptist Church of Coppell
ProJect: First Baptist Church of Coppell
Contractor: West Side Construction
Concrete Supplier and Plant: Redi Mix 1
Location of I'lacement: Paving
Slandard 6"xi2"
Area 2827 Square Inches
Concrele Report No: 37
Project No: 203-0161
MATERIALS sou,.=, sSD .~hw,. OBSERVATION DATA
Mix Number 9265 T0ne Sample Berthed: 10:0O am
CcmcnI: Thne Sampled: i I: 15 am
Sample Location 7' N & 5' E I?om tree on the cenler
Fly Ash: rd' IlavPlg - east area
Coarse Aggregate Fruck/-I ickct No 276/121683
; tcrmcdi,, Aggregate T,. peraturc
AdmlxlurCs: 31ump Range (inches): 5%"
I Weather Condinons: Clear
2 Time Started: 06:30 am
Added Water: 10 gallons Fimc Completed 06:30 pm
Sample Air Conlcm {%} 4%
Tolal Cubic Yards Placed: 350
I~,cqmred Strcnmh (Lbs/st] ill / 3,000
FBC 134 7 I2/12/03 81,060 2,870
FBC 135 30 01/05/04 131,940
FBC I36 5lA" 30 01/05/04 120,240 4,250
FBC 137 H HOLD
Remarks and/or Dislribution:
cc Mr J W Bales, s% Karcn White ~ First Baptist Church of Coppell
Mr Japles Starling (2)- gtluling-Richardson Construction [ ~ ~ ~ v
Mr ~ Stevcn Price- Datum Engineers ~/~~
Texas C~T, Inc. _ Reviewed by:
Construction Materials Testing
and Environmental Consulting
CM%
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Report Date: January 5, 2004 Date Concrete Placed: December 5, 2003
Client: First Baptist Church of Coppel[
ProJect: First Baptist Church of Coppell
Contractor West Side Construction
Concrete Supplier and Plant: Redi Mix 1
Location of Placement: Paving
Standard 6"x 12"
Area 2827 Square Inches
Concrete Report No: 38
Project No: 203-0161
MATERIALS So.,c~ ssD n.~chw. OBSERVATION DATA
Mix Number: 9265 T/me Sample Batchcd 12:35 pm
FBC 138 7 12/12/03 89,460 3,160
FBC 139 30 01/05/04 146,720 5,190
FBC 140 5%" 30 01/05/04 153,220 5,420
FBC 141 H HOLD
Rentarks and/or Distribuuon:
cc: Mr J W Ba}es, c/o Karen White - First Baptist Church of Copp,211 ~ ~x~
Mr Jim Stewart - 11 Il Architects
Mr Janles Starling (2) - Starling-Richardson Construction
Mr W Smven Price - Datum Engineers
Texas C~4T, Inc. Reviewed by:
Construction Materials Testing
and Environmental Consulting
linC,
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REPORT OF CONCRETE MIX OBSERVATION
Client:
Concrete Supplier and Plant:
January 5, 2004
First Baptist Church of Coppell
First Baptist Church of Coppelt
West Side Construction
Redi Mix 1
Paving
Date Concrete Placed: December 5, 2003
Standard 6% 12"
Area 2827 Square lnchcs
Concrete Report No: 39
Project No: 203-0 l 61
MATERIALS So~,~ sst, B,,,~,,:,, OBSERVATION DATA
Mix Nunlber: 9265 Time Sample Balchcd: 02 3(I pill
Cement: Time Sampled 03 15 pul
I:lv Ash: Sample Location: 80' E & 30' N from NE corner of pla)ground
Coarse ~ggrcgat, True'Fi [ :t No ~ 4/121726
FBC 142 7 12/12/03 74,240 2,630
FBC 143 30 01/05/04 115,560 4,090
FBC 144 53A" 30 01/05/'04 120,600 4,270
FBC 145 H HOLD
Renmrks and/or Distribution:
CC:
Mr J ;V Bales. c/o Karen \Vhite - First Baptist Church of Coppell
Mr JPnStoaarl t[llArchitects
Mr James Starling (2) - Starling-Richardson Construction
Mr. W. Stcven Price - Datum Engineers
Texas CMT, Inc.
Reviewed by:
ConstrUCtion Materials Testing
and Environmental Consulting
CMT Inc
WWW .texascmt.com
Fax (214) 352.6972
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
REPORT OF CONCRETE MIX OBSERVATION
Date Concrete Placed: December 5, 2003 Standard 6"xl2"
Report Date: January 5, 2004 Area 2827 Square Inches
First Baptist Church of Coppell Concrete Report No.: 34
Client:
First Baptist Church of Coppell Project No: 203-0161
ProJect: West Side Construction
Contractor:
Concrete Supplier and Plant: Redi Mix 1
Location of Placement: Paving
MATERIALS
OBSERVATION DATA
Time Sample Balcl~cd 0630 am
0745 am
Mix Number: 9265 qim¢ Samplcd; 15' E & 5' N t¥om SW corner ofpaxmg
Cement '1 ruckfI'icket N o: 223/121643
Fi)' Ash; Temperature:
Coarse Augregatc: Ambient l>.angc: 43°F
lillcrmcdiate Aggregate: Slump Range (inclles): 5"
Fmc Aggrcgam: Weathcr Conditions: Clear
Admixtures: Time Slartcd: 06:30 am
t ~inl¢ Completed: 06:30 pm
/2/12/03 97,540 3,450
FBC 122 01/05/04 155,880 5,5 / 0
FBC 123 5" 01/05/04 I57.500 5.570
FBC 124 HOLD
FBC 125
Fractur~ Regular Cylinders Made By: EA
Mr J W Bales, cio Karen White - First Baptist Church of Copp¢Ii
Mr James Starling (2) - Starling-Richardson Cmlstruction
ivlr W Steven Price- Datum Engineers