Loading...
First Baptist-LR040105Construction Materials Testing and Environmental Consulting T xas CM% 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Keport Date: January 5, 2004 Date Concrete Placed: December 5, 2003 Client: First Baptist Church of Coppell Project: First Baptist Church of Coppell Contractor: West Side Construction Concrete Supplier and Plant: Redi Mix 1 Location ol Placement: Paving Standard 6"x l 2" Area 2827 Square hlches Concrete Report No.: 35 Project No.: 203-0161 MATERIALS souse*, ss..,,ch w,. OBSERVATION DATA Mix Number: 9265 Time Sample Batched: 07:25 am Time Sampled: 07:50 am Cement: Sample Locallon: 15' N & 30' E from SW corner ofpa~ing Fly Ash: Truck/Ticket No: 228/12165 I Coarse Aggregate: I cmperalurc: - Concrete Range: 5 Pine Aggregate; Slump Range {roches): I Time Started: 06:3(I am 2 Time Completed: 06:30 pm Added Water: 0 gallons Sample Air Content (%): 4% Total Cubic Yards Placed: 120 Rcquir, d Strenmh (Lbs/sq in h 3.000 FBC 126 7 12/12/03 96,660 3,420 FBC 127 30 01/05/04 155,580 5,500 FBC 128 5'/~" 30 01/05/04 145,300 5,140 FBC t29 H HOLD CC: Mr J W. Bales, c/o Karen White - First Baptist Church of Coppcll Mr Jim Stewart - H [t Architects Mr James Starling (2) - Starling-Rici.,,rdson Construction Mr W Stcvcn Price - Datum }]nginccrs Reviewed by: Construction Materials Testing and Environmental Consulting Wex s nc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: January 5, 2004 Date Concrete Placed: December 5, 2003 Client: First Baptist Church of Coppell project: First Baptist Church of Coppell Contractor: West Side Construction Concrete Supplier and Plant: Redi Mix 1 Location of Placement: Paving Standard 6"xl2" Area 28.27 Square Inches Concrete ReporlNo: 36 Projecl No.: 203-0161 MATERIALS Souse., ss~, ,~.h ,,. OBSERVATION DATA Mix Number: 9265 Vmlc Sample Batchcd: 09:15 am Cmnent: Time Sampled: 09:.12 am Sample Location: 20' N & 30' g ['rom cleclric post al center Required Slrcnulh (I.hs/sqm 3.000 FBC 130 7 12/12/03 91,400 3,230 FBC 131 30 01/05/04 132,700 4,690 FBC 132 5V=" 30 01/05/04 127,260 4,500 FBC 133 H HOLD TestMcthodsUlflized FlactureRe~ular Cylinders Made By: EA Remarks and/or Dislribution: Texas C}4T, Inc. Roviewed by: Mr J W. Balcs, c/o Karen White - First Baptist Church of Coppell Mr Jim Stewart Il Ii Architects Mr James Starling (2) - Starling-Richardson Consmiction Mr W Steven Price - Datum Engineers Construction Materials Testing and Environmental Consulting Tex s CMT, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OB ,ERVATION Report Date: January 5, 2004 Dam Concrete Placed: December 5, 2003 Client First Baptist Church of Coppell ProJect: First Baptist Church of Coppell Contractor: West Side Construction Concrete Supplier and Plant: Redi Mix 1 Location of I'lacement: Paving Slandard 6"xi2" Area 2827 Square Inches Concrele Report No: 37 Project No: 203-0161 MATERIALS sou,.=, sSD .~hw,. OBSERVATION DATA Mix Number 9265 T0ne Sample Berthed: 10:0O am CcmcnI: Thne Sampled: i I: 15 am Sample Location 7' N & 5' E I?om tree on the cenler Fly Ash: rd' IlavPlg - east area Coarse Aggregate Fruck/-I ickct No 276/121683 ; tcrmcdi,, Aggregate T,. peraturc AdmlxlurCs: 31ump Range (inches): 5%" I Weather Condinons: Clear 2 Time Started: 06:30 am Added Water: 10 gallons Fimc Completed 06:30 pm Sample Air Conlcm {%} 4% Tolal Cubic Yards Placed: 350 I~,cqmred Strcnmh (Lbs/st] ill / 3,000 FBC 134 7 I2/12/03 81,060 2,870 FBC 135 30 01/05/04 131,940 FBC I36 5lA" 30 01/05/04 120,240 4,250 FBC 137 H HOLD Remarks and/or Dislribution: cc Mr J W Bales, s% Karcn White ~ First Baptist Church of Coppell Mr Japles Starling (2)- gtluling-Richardson Construction [ ~ ~ ~ v Mr ~ Stevcn Price- Datum Engineers ~/~~ Texas C~T, Inc. _ Reviewed by: Construction Materials Testing and Environmental Consulting CM% 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: January 5, 2004 Date Concrete Placed: December 5, 2003 Client: First Baptist Church of Coppel[ ProJect: First Baptist Church of Coppell Contractor West Side Construction Concrete Supplier and Plant: Redi Mix 1 Location of Placement: Paving Standard 6"x 12" Area 2827 Square Inches Concrete Report No: 38 Project No: 203-0161 MATERIALS So.,c~ ssD n.~chw. OBSERVATION DATA Mix Number: 9265 T/me Sample Batchcd 12:35 pm FBC 138 7 12/12/03 89,460 3,160 FBC 139 30 01/05/04 146,720 5,190 FBC 140 5%" 30 01/05/04 153,220 5,420 FBC 141 H HOLD Rentarks and/or Distribuuon: cc: Mr J W Ba}es, c/o Karen White - First Baptist Church of Copp,211 ~ ~x~ Mr Jim Stewart - 11 Il Architects Mr Janles Starling (2) - Starling-Richardson Construction Mr W Smven Price - Datum Engineers Texas C~4T, Inc. Reviewed by: Construction Materials Testing and Environmental Consulting linC, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Client: Concrete Supplier and Plant: January 5, 2004 First Baptist Church of Coppell First Baptist Church of Coppelt West Side Construction Redi Mix 1 Paving Date Concrete Placed: December 5, 2003 Standard 6% 12" Area 2827 Square lnchcs Concrete Report No: 39 Project No: 203-0 l 61 MATERIALS So~,~ sst, B,,,~,,:,, OBSERVATION DATA Mix Nunlber: 9265 Time Sample Balchcd: 02 3(I pill Cement: Time Sampled 03 15 pul I:lv Ash: Sample Location: 80' E & 30' N from NE corner of pla)ground Coarse ~ggrcgat, True'Fi [ :t No ~ 4/121726 FBC 142 7 12/12/03 74,240 2,630 FBC 143 30 01/05/04 115,560 4,090 FBC 144 53A" 30 01/05/'04 120,600 4,270 FBC 145 H HOLD Renmrks and/or Distribution: CC: Mr J ;V Bales. c/o Karen \Vhite - First Baptist Church of Coppell Mr JPnStoaarl t[llArchitects Mr James Starling (2) - Starling-Richardson Construction Mr. W. Stcven Price - Datum Engineers Texas CMT, Inc. Reviewed by: ConstrUCtion Materials Testing and Environmental Consulting CMT Inc WWW .texascmt.com Fax (214) 352.6972 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 REPORT OF CONCRETE MIX OBSERVATION Date Concrete Placed: December 5, 2003 Standard 6"xl2" Report Date: January 5, 2004 Area 2827 Square Inches First Baptist Church of Coppell Concrete Report No.: 34 Client: First Baptist Church of Coppell Project No: 203-0161 ProJect: West Side Construction Contractor: Concrete Supplier and Plant: Redi Mix 1 Location of Placement: Paving MATERIALS OBSERVATION DATA Time Sample Balcl~cd 0630 am 0745 am Mix Number: 9265 qim¢ Samplcd; 15' E & 5' N t¥om SW corner ofpaxmg Cement '1 ruckfI'icket N o: 223/121643 Fi)' Ash; Temperature: Coarse Augregatc: Ambient l>.angc: 43°F lillcrmcdiate Aggregate: Slump Range (inclles): 5" Fmc Aggrcgam: Weathcr Conditions: Clear Admixtures: Time Slartcd: 06:30 am t ~inl¢ Completed: 06:30 pm /2/12/03 97,540 3,450 FBC 122 01/05/04 155,880 5,5 / 0 FBC 123 5" 01/05/04 I57.500 5.570 FBC 124 HOLD FBC 125 Fractur~ Regular Cylinders Made By: EA Mr J W Bales, cio Karen White - First Baptist Church of Copp¢Ii Mr James Starling (2) - Starling-Richardson Cmlstruction ivlr W Steven Price- Datum Engineers