Loading...
First Baptist-LR031223Construction Materials Testing and Environmental Consulting T x ts CMT, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 wwxv .texascmt.com REPORT OF CONCRETE MIX OBSERVATION -- December 23, 2003 Date Concrele placed: November 25, 2003 First Baptist Church of Coppell First Baptist Church of Coppell Fire Line Custom Crete Manhole Report Dale: Client: Project: Conlraclor; Concrele Supplier and Plant: Standard 6"x12" Area 28.27 Square Inches Concrele Report No.: 32 Project No.: 203-0161 MATERIALS OBSERVATION DATA Fine Aggregate: 2 0 gallons FBC 116 I 2" FBC 117 .]. 12/02/03 12/23/03 t2/23/03 Time Sample Batchcd: Time Sampled: Sample Location: Truck/Ficket No: Temperature: ~ 5,810 175,080_ 6,190 ~ 6,270 12:30 am 02:00 am Manl~olc in Denton ]ap Rd 388/293216 51°F 61°F 2,, N/A 02:00 am 04:30 am 45% 7 ~ 600 Cylinders Made BS; DF cc: Mr J W Bales, c/o Karen \Vhite - First Baptist Church of Coppell ~ Mr Jim S ewart - H 11 Architects Mr Jeanes Starling (2) - Starling Richardson Consmmtion Mr W Stevcn Price - Datum Engineers Construction Materials Testing and Environmental Cor~sulting Texas CMT, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REINFORCING STEEL PLACEMENT Report Date: Client: Project Identification Method of Test December 23, 2003 First Baptist Church of Coppell First Baptist Church of Coppell Reinforcing Steel Observation Visual Observation Results Test Date: December 23, 2003 Gcneral Report No.: 27 Project No.: 203-0 l 61 Pa~e 1 of l On Uecember 23, ~00o, re~nforctng steel ,vo~ Paving patch approximately 2' wide strip- SW of existing church building 3/4" diameter doxvels ~ 2' c-c on each side (20"-2 t" outside, 6" embedment was used) 3~#3 rebars ran along length of the strip. There werc no discrepancies. Technician: MR Mr. J. W. Bales, c/o Kalcn White - First [3aptist Clmrch of Coppcll Mr Jim Stewart - Il H Architects Mr Jam{:s Starling (2) - Starling-Richardson Constiuction