Loading...
First Baptist-LR031212Construction Materials Testing and Environmental Consulting CM% 10044 Monroe I)rive Dallas, 'I;-xas 75229 (214) 352-6957 Fax (214) 35%6972 REPORF OF IN-PLACE DENSITY AND MOISTURE OF SOIL ' N Densltv Report io. 8 (203-0161) Method: AS'IM I)2922 D3017 D698 Page of I Client: First Baptist Chtll'Ch of Coppell 5' \trial Dcscrqmon Maxmmm Optmlt,n/ Project: First Baptist Chtlrdl of Coppell (Lbs/CuFt) Pcrccm Repor~ Date: December 12, 2003 Required Density (%): Mia95% Required Moisture (%): ()pt. ±2.5% - - (I.bs CuF ~ Comem (%) 3 I~' Lift - Along Denton ']'ap Rd. 37 Main water line along side street at NW side of church 107.5 10.5 96.1 3 2'''~ Lift - :\ long Denton Tap Rd. 38 Main v,'aler line along side street at NW side of church 1071 I0.l 95.7 3 3~° Lift - Along Denton Tap Rd. 39 Mare water line along side street at NW side of church 106.9 10.8 95.5 Test results meet project specifications CC: Mr J W [ia[cs, c/o Karen White - First Baptist Church of Coppcl] Mr Jim Stewart - H H Architects Mr James Stmling (2) - Starling-Richardson Construction Mr W Stcven I'rice - Datum Enginccts