First Baptist-LR031212Construction Materials Testing
and Environmental Consulting
CM%
10044 Monroe I)rive Dallas, 'I;-xas 75229 (214) 352-6957 Fax (214) 35%6972
REPORF OF IN-PLACE DENSITY AND MOISTURE OF SOIL
' N
Densltv Report io. 8 (203-0161) Method: AS'IM I)2922 D3017 D698 Page of I
Client: First Baptist Chtll'Ch of Coppell 5' \trial Dcscrqmon Maxmmm Optmlt,n/
Project: First Baptist Chtlrdl of Coppell (Lbs/CuFt) Pcrccm
Repor~ Date: December 12, 2003
Required Density (%): Mia95%
Required Moisture (%): ()pt. ±2.5%
- - (I.bs CuF ~ Comem (%)
3 I~' Lift - Along Denton ']'ap Rd.
37 Main water line along side street at NW side of church 107.5 10.5 96.1
3 2'''~ Lift - :\ long Denton Tap Rd.
38 Main v,'aler line along side street at NW side of church 1071 I0.l 95.7
3 3~° Lift - Along Denton Tap Rd.
39 Mare water line along side street at NW side of church 106.9 10.8 95.5
Test results meet project specifications
CC:
Mr J W [ia[cs, c/o Karen White - First Baptist Church of Coppcl]
Mr Jim Stewart - H H Architects
Mr James Stmling (2) - Starling-Richardson Construction
Mr W Stcven I'rice - Datum Enginccts