Loading...
First Baptist-LR031205Construction Materials Testing and Environmental Consulting Tex s CM% 10044 Monroe Drive Dallas, Texas 75229 (214) 352~6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 7 (203-0161) Method: ASTM D2922 D3017 I)698 Pa~e of 1 Client: First Baptist Church of Coppell Material Descripmm Maximum Optmmm D~. Moisture Density Content Project: First Baptist Church of Coppell (Lbs/CuFf) Percent Test Date: November 26, 2003 I. Reddish Brown Cla>ey Sand 112.6 13.2 2. Dark Brown Sandy Clay 106.1 15.9 3. Brown Sandy Clay- Cemenl Treated 111.9 11.9 Report Date: December 5, 2003 Rcquired Density (%): Min95% Required Moisture (%): Opt. ±2.5°/,, 3 Manhole - Final 36 16' W. of curb, 4' S. of manhole 106.9 9.9 95.5 Test results meet project specifications cc: Mr. J W Bales, c/o Karcn White - First Baptist Cl~urch of Coppell Mr. Jim Stewart - It Ft Architects Mr. James Starling (2) - Starling Richardson Constructmn Mr W gteven Price - Datum Engineers Construction Materials Testing and Environmental Consulting Tex2$ CM% [nc 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascrnt.com REINFORCING STEEL PLACEMENT Report Date: Client: Project Identification Method of Test December 5, 2003 First Baptist Church of Coppell First Baptist Church of Coppell Rein~brcing Steel Observation Visual Observation Results Test Date: November 26, 2003 General Report No.: 24 Project No.: 203-0161 Pa~.e 1 of l On '.~ 3vember 26, -00~, reinforcing steel ,.vas observed ,,t the following I ), ations: Manhole - Denton Tap Rd. There were no discrepancies. Technician: DF CC¸ Mr. J W. Bales, c/o Karen White - First Baptist Church of Copp¢ll Mr Jim Stewart - [-t [t Architects Mr James Staffing (2) - Starling-Richardson Construction Construction Materials Testing and Environmental Consulting Tox 8 CMl Inc 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REINFORCING STEEL PLACEMENT Report Date: Client: Project identification Method of Test December 5, 2003 First Baptist Church of Coppell First Baptist Church of Coppell Reinforcing Steel Observation Visual Observation P, esults Test Date: December 2, 2003 General Report No.: 25 Project No.: 203-016 l Pa~e I oil On December 2, .00J, rel, forcip~; steel ,,vas observed at the following locations: SW ramp grade beam There ~vere no discrepancies. Technician: EA Mr J W. Bales, c/o Karcn \Vhit¢ - Fust Baptist Church of Coppc[l Mr Jim Stewart ~ Il ]l Architects Mr James Starling (2) - Starting-Richardson Construction