Loading...
First Baptist-LR030813Construction Materials Testing and Environmental Consulting Tex s CMT, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density RepoPt No. 2 (203-0161) Method: ASTM D2922 D3017 D698 Page of 1 Client: First Baptist Church of Coppell ~aterial Description Maximum Optimum Dry Moisture Density Content Project: First Baptist Church of Coppell (LbsdCuFi) Percent Test Date: August $~ 2003 Reddish Brown Ctaye~ Sand 112.6 13.2 2. Dark Brown Sandy Clay 106.1 15.9 Report Date: August 13, 2003 Required Density (%): Min 95% Required Moisture (%): Opt. ±5%-Saud Mat Location/Elevation (an&or) Lift In-Place In-Place Percent No DO' Density Moisture Compaction l'est (Lbs./Cu Ft) Content (%) No 2 Retest # 2 6 101.4 18.7 95.6 Test results meet project specifications cc: Mr J,W Bales - First Baptist Church ol Copp¢ll Mr Mark Hi[I- H H Archilccts Mr James StarLing - Starling-Richardson Construction Materials Testing and Environmental Consulting Texas CM% 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PL,aCE DENSITY AND MOISTURE OF SOIL '203-0161' Method: ASTM D2922 D3017 D698 Pal~e of 1 Client: First Baptist Church of Coppdl Material Dcscnptmn Maximum Optimum Project: First Baptist Church of Coppell (Lbs/CuFt) Percent Test Date: August 4, 2003 1. Reddish Brown Clayey Sand 112.6 13.2 Report Date: August 13, 2003 Required Density (%): Min 95% Required Moisture (%): Opt. ±5%-Sand 2 1" Lift 1 SW corner of building pad 102.9 19.1 97.0 2 1~' Lift 2 Upper sanctuaD floor 93.I 16.4 87.7 * 2 Subgradc ~ cut section 3 NE comer of building pad 104.9 12.4 98.9 2 Subgrade - cut section 4 East/center of building pad 107.6 20.6 101.4 2 Subgrade - cut section 5 SE corner of buildiog pad 102.1 19.2 96.2 * Test results do not meet project specifications cc: Mr J,W Bales - First Baptist Church ofCoppell Mr James Starling - Starling-Richardson