Loading...
ST9301-CS040204T H E , ~ I T Y 0 F COl'FELL February 4,2004 Jorge Barrera Comcast Cable Communications, Inc. 934 E Centerville Rd Garland TX 75041 RE: Sandy Lake Road ST 93-01 Utility Relocations Dear Mr. Barrera: The Sandy Lake Road project consists of the reconstruction of the existing two-lane asphalt roadway to a four-lane divided boulevard with improved drainage. The City has completed the right-of-way acquisition and the project is scheduled to start construction in June 2004. Enclosed are plans adequate for utility relocations. Please initiate any necessary utility relocations. Eight new control points were set on December 23, 2003 and are shown on sheet 5 of 94 in the plans. You will need to submit relocation plans and obtain a right-of-way use permit prior to starting the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Suza~i Taylor C.I.PSG~ordinator Enclosures COPPELL Mr. Bob Holland Verizon Communications 2094 McGee Lane Lewisville TX 75077 COPPELL Mr. Don McKelvain Brazos Electric Co-op 2404 LaSalle Ave PO Box 2585 Waco TX 76702-2585 COPPELL Tim Norris, Operations Mgr. OnFiber Carrier Services 1820 N Glenville Dr., Suite 114 Richardson, TX 75081 COl'FELL Mr. Doug Brewer TXU Gas 4200 North Belt Line Road Irving, Texas 75038 COPPELL Jorge Barrera Comcast Cable Communications, inc. 934 E Centerville Rd Garland TX 75041 COl'FELL Mark Wilson TXU Communications Services 115 W Seventh St, Suite 308 Ft Worth, TX 76102 COPPELL COPPELL Patrick Nwakoby Explorer Pipeline 6846 S Canton Tulsa, OK 74136 T H £ - C I T Y 0 F COl'FELL February 4, 2004 Mr. Pete Nielson Senior Project Manager AboveNet 5080 Spectrum Drive, Suite 800 W Addison, Texas 75001 RE: Sandy Lake Road (Kimbel Kourt to East City Limits) ST 93-01 Utility Relocations Dear Mr. Nielson: The Sandy Lake Road project consists of the reconstruction of the existing two-lane asphalt roadway to a four-lane divided boulevard with improved drainage In September 2002, your firm indicated that it did not have any facilities within the proposed project limits. At that time, construction of the improvements was anticipated to start in early 2003 The City has completed the right-of-way acquisition and the project is now scheduled to start construction in June 2004 lf'AboveNet has constructed facilities within the project limits since September 2002, please let me know and I will send you a set of construction plans Sincerely, Suzar~ Ox Taylor C. k P:-Q0ordinator 972-304- 7019 Sent to: Mr. Michael J. Early Manager Network Services AT&T Local Network Services 4100 Bryan Street, Suite 615 Dallas, Texas 75204 Mr. Rodger Cloninger McLeod USA 15601 North Dallas Parkway Suite 700 Dallas, Texas 75001 Mr. Roy Busby Engineering Manager CoServ 7701 South Stemmons Corinth, Texas 76210-1842 Mr. Paul Gonzales Relocation Manager ,Quest Communications 1860 Lincoln Street, Suite 200 Denver, Colorado 80295 Ms. Lisa Cantu SBC Communications 1460 Roundtable Dallas, Texas 75247 Ms. Carole Jackson Senior Technician 360networks (USA) Inc. 1710 Hwy. 51 South, Suite 20 PMB 201 Decatur, Texas 76234