Loading...
Old Townhomes-CS040211 T H E C I T Y 0 F~ COFFELL P.O. Box9478 255 Parkway Blvd Coppell, TX 75019 Phone:(972)304-3686 Fax:(972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Kurt Jones From: Ken Griffin, P. E., Director of Engineering Fax #: 972-735-9976 Date: 2/11/2004 Phone #: Pages: 5 (including cover sheet) Re: Old Coppell Townhomes Fees CC: ( ) Urgent ( ) For Review ( ) Please Comment ( ) Please Reply ( x ) As Requested Comments: Preliminary fee assessment attached. Note that street light, street sign and construction fees are not included until we receive additional information. Also, if the meter size changes then the fee assessment will change. This fee assessmem only covers what is referred to as Phase 1. Please provide a letter requesting that fees be assessed based on the phasing. Ken Griffin IF YOU DO NOTRECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3686 "City of Coppell Engineering- Excellence By Design" DEVELOPMENT FEE TABLE Project: Old Coppell Townhomes (Preliminary Estimate) Date: 2/11/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,660.00 (100% due at Issuance o£ Building Permit) Water Tap Inspection Fee $400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) S146.$6 (100% due at Issuance o£ Water Meter) Water Meter Fcc (lrrigation/Fireline) $61.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $210.00 ( 100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater hnpact Fee $1,960.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $350.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $350.00 (100% due at issuance of Building Pemait) Park Fee $7,710.00 $7,710.00 (100% due prior to Council Approval) Roadway Impact Fee $5,130.00 $5,130.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Int'ormation not Available (100% due prior to Acceptance oF Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II TOTAL $19,008.66 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $12,840.00 DEVELOPMENT FEE WORKSHEET PROJECT: Old Coppell Townhomes (Preliminary Estimate) DATE: 2/11/2004 Water impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 7 - 5/8 inch X 3/4 inch 7 ESU's 1 - 1 inch 2.5 ESU's 0 0 ESU's 0 0 ESU's Total #: 9.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 8 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 7 Domestic Meter(s) @ $20.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $61.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 7 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 7 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 7 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 7 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $2,660.00 $400.00 $146.86 $61.80 $0.oo $0.oo $210.00 $30.0o $1,960.00 $350.00 $350.00 Page1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 6 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Zone 1 $7,710.00 $0,00 $5,130.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment, The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Old Coppell Townhomes (Preliminary Estimate) 2/11/2004 ROADWAY IMPACT FEE: Service Area * 5 ,Category ** Residential Land Use ** Residential Others Not Specified X~o. Lots/Units 6 Development Units ** 6.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle M les per Development Unit) x (Fee per Vehicle Mile) = $5,130.00 * (Figure 2 - Road~vay Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) HP Laser Jet 3330 City of Coppell 972 304 3570 Feb 11 2004 ll~28AM F~Faax Call Report Job Date Time Type Identification Duration Pages Result 316 2/il/2004 ]1:27:13AH Send 9727359976 1:17 5 OK COP?ELL ENGINEERING DEPARTMENT FAX COVER SHEET