Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
First Baptist-LR040210
FEk: 10 2'0~4 14: i? Construct/on kLatedMs Testing ~ud £m%onmentM Consulting Texas CM% P.01/01 10044 Monroe Drive Dallas, Texas 7522:9 (214) 352-6957 Fax (214) 352-6972 www 4exascmt.com REPORT OF CONCRETE MIX OBSERVATION February 10, 2004 Date Concrete Placed: Jafedary 13, 2004 First Baptist Church of Coppell Fire Line Services Redi Mix [ Paving ?rojectNo 203 0161 MATERIALS so.,,~ sso n.,ca w~ OBSERVATION DATA Comer,; Fime Sampled: 02:00 pm NW ~ide of church Coarse &ggrcgatc Tmc~icke[ No: Ambtem Range '/30F ~dm~xtu~cs Slu~p Range inches) I%" I Wea~er Conditions: Clear 2 Time Sla~ed: 1200 pm ~dded %~atcr 0 gallons lime Complcled 04 O0 pm Sample Air Content (%) Coral Cubic Y~ds Placed: 3 Rcquh, d Strength {Lbs/sq m 4.000 .... FBC 162 7 01/20/04 141,860 FBC 163 1 Vd' 28 02/10/04 163,200 FBC 164 28 02/I0/04 173,680 FBC 165 H HOLD Mr J W Bales, c'¢ Kamen ~ite - First Baptist Church of Coppcll Mr Jim 5tcv, arl- Iq H ArchKcc~5 Mr Jame~ Stmlmg (2) $~hng-Rich~dson Con~ction Mr. Lcc Sto~e- F~: 972 304 3514 Mr La~ Dawn = F~: 972 304 3570 Pom-I~ Fax Note 7671 ~,,o ~ l~a~ ewed by: TOTAL P.O1