Loading...
Sandy Lk Med-LR031210Client: C.F. Jordan Report of Field Compaction Testing Project: Coppeli Health Center Report No. 03-1041-1 7 Date Tested: 12/10/03 Technician: J. Pacheco A~tenal ~at~ SoU Maximum Dry OpUmum 10 Denstty (pc~) Moisture (%) 1 1~1.0 15.3 Distribution: 80 FG 82 FG-0.7 83 FG In-Place Test Results File Index: FDT Specifications M.C. 2 5 80' N Et 58' E from the northeast corner fo the buJJdin~. 18" S.S. t 6,0 17.7 107.9 97.2 58' E Et 100' S from the northeast corner of the building, 15" S. S, 1 6.0 17,6 107.8 97.1 58' E Et 100' S from the northeast corne, r of the building. 15" S.S. I 6.0 17.8 107.5 96,8 58' E Et 10(7 S from the northeast corner of the Respectfully Submitted, INC. Report of Field Compaction Testing Client: C.F. Jordan Project: Copper( Hea(th Center Report No. 03-1041-17 Date Tested: 12/10/03 Technician: J. Pacheco Material Oa~ Soil Maxtmum Dry Opt~murn Distribution: File Index: FDT Specifications M.c. 92 98 In-Place Test Results 15' N Et 70' E from the northeast corner of the bui[din~J. 2' dom tine. I 6.0 t7.6 108.2 97.5 70 FG-2.10 1§' N Et 70' E from the northeast corner of the 15' N E~ 70' E from the northeast corner of the buitding. 2" dom tine. ~ 6.0 17.8 108.0 97.3 15' N Et 70' E from the northeast corner of the buitding. 2' dom tine. I 6.0 17.5 108.3 97.6 73 FG-2.80 10' N E: 55' W from the northeast corner of the buitdfng. Flit. ~ 6.0 !7,3 107.8 97,1 10' N Et 55' W from the northeast corner of the bufldfn~. Fitt. ~ 5,0 ~7,6 107.2 96.6 75 FG,1.4 15' N Et 55 W from the northeast corner of the buitdin~. Fitt. ~ 6.0 ~7.7 107.1 96.5 20' N Et 55' W from the northeast corner of the buitding. Flit. ~ 6.0 17.4 lOT.S 96.8 20' N Et 55' W from the northeast corner of the buitdfn~. Fit[, 1 6.0 17.5 t07.2 96.6 80' N ~ 58' E from the northeast corner of the buitding, 18" S.S. 1 6.0 ~7,7 107.7 97.0 80' N Et 58' E from the northeast corner of the building. ~8" S.S. ~ 6.0 !7.6 !07.5 96.8 Respectfutty Submitted. SPERM GLOBAL $£RV~,CE$, INC.