Sandy Lk Med-LR031201Report of Field Compaction Testing
Client: C.F. Jordan
Project: Coppe[[ Health Center
Report No. 03-1041-15
Date Tested: 12/1/03
Technician: J. Pacheco
/~tenat Data
Distribution:
File Index: FDT
Specifications
61 FG-2.80
62 FG-2.10
63 FG-1 40
54 FG 0.7
65 FG-2.80
66 ?G 7..10
In-Place Test Results
~.c. 2 5
6" Fire Line, 60' E[t 7' N from the northeast
corner of the building. 1 6.0 16.5 lO6.4 95.9
6" Fire Line, 60' E E~ T N from the northeast
6" Fire Line, 60' E [~ 7' N from the northeast
6" Fire Line, 60' E ~ 7' N from the northeast
6" Water Line to F.H., 37. N ~t75' E from the
6" Water Line to F.H., 37. N [t75' E from the
6" Water Line to F.H., 37. N [z7§' E from the
6" Water Line to F.H.. 3T N &75' E from the
Respectfully Submitted.
SPECTRUM GLOBAL SERVIC£$,-INC.
Report of Field Compaction Testing
CHent: C.F. Jordan
Project: Coppeil HeaLth Center
Report No. 03-1041-15
Date Tested: 12/1/03
Technician: J. Pacheco
AAae~rial Data
111.0 15.3
105.0 18.0
Dtstrtbution:
File Index: FDT
Test
No. Elevation
52 FG-3.50
53 FG-2.80
54 FG*2.10
55 FG-1.40
56 FG-0.7
57 FG-2.80
58 FG-2.10
59 FG-1.40
60 FG-0.7
In-PlaceTest Results
Specifications
92 98
92 98
2 5
Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore
Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore
Road. ~ 6.0 16.7 106.1 95.6
Sanitary sewer, Bore Pit, 20' W of M.H. on Moore
Road. ~ 6.0 ~6.8 106.2 95.7
Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore
Sanitary Sawer, Bore Pit, 20' W of M.H. on Moore
Road. 1 6.0 16.4 105.7 95.2
Sanitary sewer (6"), 50' W of M.H. on A~ore
Road. 1 6.0 16.9 106.0 95.5
Sanitary sewer (6"), 50' W of M.H. on M~ore
Sanitary sewer (6"), 50' W of M.H. on M~ore
Road. t 6.0 16.7 105.8 95.3
Sanitary Sewer (6"), 50. W of M.H. on Moore
Road. 1 6.0 16.5 ~05.9 95.4
RespectfuLLy Submitted,
SPECTRUM GLOBAL SERVICES, INC.