Loading...
Sandy Lk Med-LR031201Report of Field Compaction Testing Client: C.F. Jordan Project: Coppe[[ Health Center Report No. 03-1041-15 Date Tested: 12/1/03 Technician: J. Pacheco /~tenat Data Distribution: File Index: FDT Specifications 61 FG-2.80 62 FG-2.10 63 FG-1 40 54 FG 0.7 65 FG-2.80 66 ?G 7..10 In-Place Test Results ~.c. 2 5 6" Fire Line, 60' E[t 7' N from the northeast corner of the building. 1 6.0 16.5 lO6.4 95.9 6" Fire Line, 60' E E~ T N from the northeast 6" Fire Line, 60' E [~ 7' N from the northeast 6" Fire Line, 60' E ~ 7' N from the northeast 6" Water Line to F.H., 37. N ~t75' E from the 6" Water Line to F.H., 37. N [t75' E from the 6" Water Line to F.H., 37. N [z7§' E from the 6" Water Line to F.H.. 3T N &75' E from the Respectfully Submitted. SPECTRUM GLOBAL SERVIC£$,-INC. Report of Field Compaction Testing CHent: C.F. Jordan Project: Coppeil HeaLth Center Report No. 03-1041-15 Date Tested: 12/1/03 Technician: J. Pacheco AAae~rial Data 111.0 15.3 105.0 18.0 Dtstrtbution: File Index: FDT Test No. Elevation 52 FG-3.50 53 FG-2.80 54 FG*2.10 55 FG-1.40 56 FG-0.7 57 FG-2.80 58 FG-2.10 59 FG-1.40 60 FG-0.7 In-PlaceTest Results Specifications 92 98 92 98 2 5 Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore Road. ~ 6.0 16.7 106.1 95.6 Sanitary sewer, Bore Pit, 20' W of M.H. on Moore Road. ~ 6.0 ~6.8 106.2 95.7 Sanitary Sewer, Bore Pit, 20' W of M.H. on Moore Sanitary Sawer, Bore Pit, 20' W of M.H. on Moore Road. 1 6.0 16.4 105.7 95.2 Sanitary sewer (6"), 50' W of M.H. on A~ore Road. 1 6.0 16.9 106.0 95.5 Sanitary sewer (6"), 50' W of M.H. on M~ore Sanitary sewer (6"), 50' W of M.H. on M~ore Road. t 6.0 16.7 105.8 95.3 Sanitary Sewer (6"), 50. W of M.H. on Moore Road. 1 6.0 16.5 ~05.9 95.4 RespectfuLLy Submitted, SPECTRUM GLOBAL SERVICES, INC.