Loading...
Freeport NIP(2.8)-CS040205MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Bruce Harris, Raymond Construction From: Keith Marvin, P.E. Date: RE: February 5, 2004 · Grading Permit for Dexas The attached permit is for Early Grading only. 1. The construction of the proposed retaining wall shall not take place under this permit. 2. Engineering plans shall be submitted and approved prior to construction of this wall. 3. Do not fill beyond the 517° contour line until plans for the proposed wall have been reviewed and approved. 4. Final grading adjacent to the floodplain will need to be completed after the construction of this retaining wall. cc: Jack Evans, Pacheco Koch "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"