ST9302-CN030528Alpine Fence Company Inc.
P.O. Box 2295 CoppelI,Texas 75019
(972)471-1020*(972)734-6642
www. alpinefenceinc.com
Proposal To: Garreth Campbell
Address:
Phone: 469-576-7708
Date: 5-28-2003
Specifications: All work will be performed in ac. con;lance with specifications on this proposal and the fence will
be built in a workmanlike manner and completed as soon as possible.
Terms of payment: Cash with order $
Cash on completion $
Description of fence:
Add 60- 6' 1 x 6 Cedar Boards
Splice Rails
Replace 1 Rail
Re-Nail Loose Pickets
Total Bids 648.00
Thank Youll
More or less materials and/or labor other than the amount contracted for will be debited or credited
at current rates.
Property owner is solely responsible for locating and staking fence lines. Purchaser hereby agrees that
Alpine Fence Company Inc. will not be held responsible or liable for any damage of any nature to any
pipes,wires,conduits,sewers,sprinkler systems,pool equipment or any other obstruction not described on
the order when customer signs the contract. Acceptance: The above proposal when accepted by Alpine
Fence Company becomes a contract between two parties and is not subject to cancellation. Unless
accepted within 15 days the above prices are subject to change. In case payment is not made as specified
(in terms of payment)
Alpine Fence Company Inc. reserves the right to take what ever actions are necessary to collect and will
be reimbursed by the customer.
Salesman: John Ragan ?, .~epted:.~.
J WiTT, CI'I'Y 1,fAI~IAGER DATE
2148535917
85/29/2003 01:13 2148535917 ALPIHE FENCE
Alpine Fence Company Inc.
P.O. Box 2295 CoppelI,Texas 75019
(972)471-1020'(972)734-6642
wvwv.alpinefenceinc_com
PAGE 0i
Proposal To: Garreth Campbell
Address:
Phone:469-576-7708
Date: 5.28.2003
Specifications: All work will bc pcrformcd in eooo~anoc with opcoifioation$ on thi~ proposal and the fence will
be built in a workmanlike manner and completed as soon as possible.
Terms of payment: Cash with order $
Cash on completion $
Description of fence;
Add 60 - 6' I x 6 #1 Cedar Boards
Splice Rails
Replace 1 Rail
Re-Nail Loose Pickets
Total BidS 648.00
Thank Youll
fo-to
More or less materials and/or labor other than the amount contracted for will be debited or credited
at current rates.
Property owner is solely responsible for locating and staking fence tines. Purchaser hereby agrees that
Alpine Fence Company lac. will not be held responsible or liable for any damage of any nature to any
pipes,wires,conduits,sewers,sprinkler systems,pool equipment or any other obstruction not described on
the order when customer signs the contract. Acceptance: The above proposal when accepted by Alpine
Fence Company becomes a contract between two parties and is not subject to cancellation. Unless
accepted within 15 daysthe above prices are subject to change, In case payment is not made as specified
(in terms of payment)
Alpine Fence Company Inc. reserves the right to take what ever actions are necessary to collect and will
be reimbursed by the customer
Salesman: John Ragan Accepted: