Loading...
Gateway BP(2.4)-LR 950104 reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT 1 1982 .1 12/07/94 REPORT NO.: JOB NO.: DATE CAST: Office/Warehouse - Freeport Pky @ 3000 PSI pROJECT: Gateway Blvd. SPECIFICATION: Paving - island between eastbound & 10/60 yds LOCAl]ON: westbound lanes of Gateway, 10'W of Freep~REPRESENTEO: ARCH~ECT~ENGINEER: SAMPLEDBY: R. Thompson Clean Cut BY ORDER OF: CONTR*CTOB: 01/04/95 Cattellus Development Corp. 12/14/94 REPORTED TO: DATE: ORDER NUMBER: Client (E x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SQ. IN. LABORATORY NUMBER ~ELDNUMBER: GF120701 GF120702 GF120703 107,000 151,000 147,000 M~IMUM LOAD, LBS: 7 28 28 AGE WHEN TESTED, DAYS: 3780 5340 5200 COMPRE~IVE SI~RENGTH, 5270 AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.} , · , REMARKS: Does comply with Specification METHOD OF CURING: FIELD I DAys, LABORATORY FROM 12/08/94 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 4 8 °F MIX 4 4 °F. AIR CONTENT4 . 8 0 ~/e, SLUMP 6 . 0 TIME OF SAMPLE: 12: 20 ~M, PICK-UPCHARGE: _YJ;S 8274 307801 INCHES FINE AGGREGATE: UNIT WEIGHT COARSE AGGREGATE: YIELD WATER: CEMENT: (~/~'s~ff Ass°c ia t es' Inc'/Mr' Pat Ack er ~) City of Coppell/Mr. Ken Griffin (1) Clean Cut/Mr. Bill Mills SIGNED 1 1 TEST METHODS: ASTM C31, C3g, C143, C 173, C 192, C231,ORC1064 PAGE OF 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/35(~5600 · (FAX)214/35(~0019