Verizon-PT 990311Bore/Excavation in Public Right-Of-Way Permit
City of Coppe!l - Public Works Department
Date:
Permit
Phone:
~'~ergency Phone:
Rcpresenting:
Inspector:
~]12e of Work/General Description:
Location of work:
Have All City and/or Franchise Utilities Been Contacted and
Existing utilities Located: YES ~' NO
will It Be Necessall; to Excavate
Pavement? YES (attach
Street, ;~lley or Sidewq~k
permit) NO
Representative(s) of the Franchise/Contractor must adhere to all
construction standards approved by the City of Coppell, which
includes but is not limited to: Compaction of Trenches and Bores,
and Barricading according to the Texas Manual on Uniform Traffic
Control Devices. Area(s) affected must be restored to as good
condition as before the commencement of work.
Any excavation requiring closing of a street or alley must be
reported to the Police, Fire, and Public Works Departments prior
to closing (462-1144, 462-1133 and 465-8495).
Attach Work Order (Franchise Only)
PAGE 2
P E P~MI T
Attach Earricading/Detour Plan if a lane or street closure is
applicable.
Franchise/Contrac ~or Representative
?ranchise Inspector/or City Inspector
Ao~rcvec/Ci5¥ Re o r e s e nL'~-c '-ye
Date
Auolicant shall indemnifZ and forever hold harmless against each
and eve~f claim, demand or cause of action that may be made or come
against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the
applicant under perth, it from the City, if such pe-~rn, it is granted.
PERMIT. PHB
Ail contractors will contact Public Works @ 462-8495 to have
trenches and/or open cuts inspected prior to back fill operation
taking place. Staff will be sent to inspect the project.
* NO WET BORES ALLOWED!