Loading...
First Baptist-LR040217Cor~rruction Materials Testiet~ and En~Sromnental Consulting Texas ,CMT, II1C, P. 81,,81 10044 MonroeDrivc Dallas, Texas 75229 (214) 352.6957 Fan (2.14) 352-6972 www .texascrat.com REPORT OF CONCRETE MIX OBSERVATION Report Date: February 17, 2004 Date Concrete Placed: January 20, 2004 Cliea ~ First Baptist Church of Coppcll Project First Baptist Church of Coppell ConlrnPtor Westside Construction, [tlc. C0l<ret¢ 5upphcr and Plant: RedJ Mix 1 Location of Placement: Stairs Standard 6"x 12" Area 28,27 Squa.~ Inches Concrete Report No: ~,~ Project No: 203 -0161 MATERIALS 9265 FBC t66 FBC 167 FBC 168 FBC 169 0 gallons ASTM C-3 LC,39,C 143 OBSERVATION DATA 01/27/04 106,680 02/17/04 169,.320+ 02/17/04 167,940 tlOLD Slunlp Range (inches) Weathgr Conditions: P.c~uit 4 Strength (Lbs/sq in ) 3,770 5,990 5,940 N/A 09:48 am SW comer of project 273/123602 40°F 5O°F Clear 08:00 am I 1 O0 am 3000 cc: Mr. J W Bales, c~o Karcn white - First Baptist Church of Coppcl[ Mr Jim Stewart - H H AlchitecL'~ Mr James Starling (2) - Starllng-Richatdson ConstruOaon Mr Ccc Stone - Fax: 972-304-3514 Mr Larry Davis = Fax: 9?2-304-3570 Past-It~ Fax Note 7671 Cylinders Made By: AB TOTAL P. 01