Loading...
Securelock-LR040212Client: Houghton Capital Project: SecurLock Self Storaqe __ ' L;o~pell, I ,~ GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALI AS' FORT WORTH HOUSTON AUSTIN LONGVIEW 2400GavelD¢¢ve Bide 25FoffWo¢lh Texas76118 phone (817) 2849363 fax(817) 284-9430 Concrete Compression Test Report Report Distribution: (1) Houghton Capital (1) Prime Construction Company (1) City of Coppeil (1) City of Coppell TMI Report No.: Report Date: FC03-63414-005 02/12/2004 Specifications Test Data Strength 4000 psi ~ 28 Days Placement Date 01/09/2004 Slump 4 in max Sampled By Ryan Barton Air Content n/a Weather Clear/10-15 mph Concrete Temperature n/a Supplier/Mix Redi-Mix/604 Ambient Temperature n/a Air Content Method ASTM C-231-B Field Data Set #1 Ticket Number: Slump: Concrete Temperature: Placement Location: 123255 Time Batched: 15:14 2 in Air Content: 4.8 % 65° F Ambient Temperature: 55° F Manhole Sanitary Sewer Line 1; Sta 6+75 & Sta 7+84 Sample Location: Sta 6+75 Time Sampled: 15:45 Unit Weight: n/a Yardage (c.y.): 5 of 5 Concrete Compression Test Results Age Max Load Area Strength Set # Cyl~der Test Date (days) (lbs force) (sq.in.) (psi) 1 SLC01090401 01/16/2004 O 141900 28.27 1 SLC01090402 02/06~2004 178486 28.27 1 SLC01090403 02/06/2004 178279 28.27 1 SLC01090404 Hold 28 day average 6310 Fracture Type Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. WATER ADDED: n/a TERRA-MAR, INC. R. Cad Lee, S.E.T. Materials Testing Manager The results presented in this report pertain only to the specific items tested. This repod was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. Page I of I