Loading...
ST9301-CS040204 (2)02/16/2004 MON 14:06 FAX COPPELL [~]O01/OOl -ot February 4, 2004 Mr. Roy Busby Engineering Manager CoServ 7701 South Stemmons Corinth, Texas 76210-1842 Sandy Lake Road (Kimbel Kourt to East City Limits) ST 93-01 Utility Relocations Dear Mr. Busby: The Sandy Lake Road project consists of the reconstruction of the existing two-lane asphalt roadway to a four-lane divided boulevard with improved drainage. In September 2002, your firm indicated that it did not have any facilities within the proposed project limits. At that time, construction of the improvements was anticipated to start in early 2003. The City has completed the right-of-way acquisition and the project is now scheduled to start construction in June 2004. If CoServ has constructed facilities within the project limits since September 2002, please let me know and I will send you a set of construction plans. Sincerely, Suzan/C~Taylor C.I.P. ~brdinator 972-304-7019