Loading...
ST9301-CS040220FE~20~004 3:58P~ AboveNet 9?2??88990 MFM DALLAS OPS MO. 845 P. 1/2 sq Sent Via Facsimile (972) 304-3673 February20,2004 Suzau C. Taylor CIP Coordinator City of Coppell 255 Parkway PO Box 9478 Coppell, TX 75019 Sandy Lake Road 0tlmbel Kourt to East City Limits) ST 93-01 Utility Relocations Dear Ms. Taylor, Thank you for your notification of the above referenced project. Please be advised that the facilities of AboveNet, Inc. (Metromedia Fiber Network) have not changed to be irt conflict with the above referenced scope of work. Should your project plan change, please send notification using thc contact information provided below. If you require any further information, please contact me at (972) 778-8927. Project Coordinator j ani ce. scott ~ab ove.net -- Bnclosure 5080 Specu-umDrive, Suite 800W · Addison, TX 75001 * TEL 972-778-8900 * i~AX 972-778-8990 FEB~20~200~ 3~5~ ~F~ D~LL~S ©~S ~©~8~5 P~2/2 February 4, 2004 Mr. Pete Nlelson Senior Project Manager AboveNet 5080 Spectrum Drive, Suite 800 W Addison, Texas 75001 Sandy Lake Road (Kimbel Kou~t to East City Limits) ST 93-01 Utility Relocations Dear Mr. Nielson: The S~ndy Lake Road project consists of the recomtmction of the existing two4ane asphalt roadway to a four-lane divided boulevard with improved drainage. In September 2002, your firm indicated that it did not have any facilities within the proposed project limits. At that time, construction of the improvements was anticipated to start in early 2003. The City has completed the right-of-way aC~luisition and the project is now scheduled to start construction in lune 2004. If AboveNet has constructed facilities within the project limits since September 2002, please let me know and I will send you a set of construction plans. Sincerely, ylor dinator 972-304-7019