Loading...
First Baptist-LR040225Comt'm~fon Materials Testing and Environmental Consulfag Texas CMT, Inc. 10044 Monroe Drive Dallas, T~xas 75229 (214) 352-6957 ° Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Datc~ February 25, 2004 Date Ceac,~te Pla~: February 18, 2004 Clignu ~ First Baptist Church of Copp~ll Projocl: ~'~'--f First Baptist Church of Copp~ll Conuaezor: West Side Consn'uetion Concrete Supplier and plant; R~li Mix l Location or'Placement: Paving Stand~rd 6"x12" Area 28.27 Square Inches Concrele Report No.: 5 1 Project No.: 203-0161 MATERIALS s~ sm s.~ ~ OBSERVATION DATA Mix Number; 9265 Tim~ Sample Batchcd; Fly Ash: Coarse A~tc: T~ No: ~e~ Ran~: 64'F Admixtures: Sl~p 1 W~r Co~itions: Clear 2 Ti~ S~; 09:4~ am Add~ Water T~ Cubic Y~ Placed; 120 04:00 pm 04:43 pm 10' W. from the fire hydnmt NE of paving, NW 232/124760 g~uit t $~,~h (Lbs./s~.Jn FBC 190 02/25104 97,960 FBC 191 03/18/04 FBC 192 5" 28 03/18/04 FBC 193 ~ HOLD Remarks an~Vor Distribution: Mr. J W. Bales~ c/o Katen Whim - F~t B~ch of Co~ll Mr. Jim Stew~ - H H ~chi~ Mr. J~*s S~ling (2) - S~ling-Righ~ Mr Lee Stong - F~: 972-3~-3514 Mc L~ Davis = F~: 972-304-3570 TOTAL ~.02 FEB-~5-~004 14:06 Co~bru~tion Materbla Te~d~g a~ !~nvlrom~ental Con~uJtln~ Texas CMT, Inc. P.0~/02 10044 Monroe Drive Dallas, Texas 75229 * (214) 352-6957 * Fax (214) 352.6972 www .texascmt.¢om REPORT OF CONCRETE MIX OBSERVATION RcOo~ ~a~c: February 25, 2004 Data Concrete Placed: February l 8, 2004 Client: ~ First Baptist Church of Coppell Proj~t: ~ First Baptist Church of Coppell Conlractor: We~! Side Construction Concmm Supplier and Plant: Redi Mix 1 Location o f Plae~nn~nt: Paving Standard 6"x 12" Area 28.27 Square Inches Concrete Report No.: 50 Project No.: 203 -0161 MATERIALS so,~ sso.,~ w~ OBSERVATION DATA Mix Number: 926~ Time Sample Balched,. Cement: Ti,~ Sampled: FIO¢ Aggregate: Ambient Raage: 64'F Admixtures: Concerto Range: 61 °F Slump Range (inches): $" 1 Weather Conditions: Clem 2 Thne Started: 09;45 am Added Water: I0 8allon$ Time Completed: 06:15 pm Sample Air Content (%): 5% Total Cubic Yards Placed: 30 12;23 pm 22' E. & 24' $. from SE corner of church building - SE parkio$ 126/124730 R~quir ~1 Strength (Lbs,lq,in, 2t.000 Number Slam~ ({~ ~ ~ Telal LO~} ~ Rmmtk$ ... Testat (Ua ) J , .~ 187 5" ~ 28 03/18/~ FBC 188 28 03/18/~ FBC 189 ~ HOLD cc: Mr J, W, Bales. c/o Katen White - First Baptist Chinch of Copl: .11 Mr. Jim Stewart - H H Architects Mr. James Starling (2) - Starling-Richardson Cr, ns~ruction Mr. Lee Stone - Fax: 972-304-3514 Mr. Larry Davis 1 Fax: 972-304-3570 Post-it' Fax Note 7071 Date ~ / Ip~b- .... CoJDept Co.