SS0201-CS040224Ol-OB-03 lZ:4Gpm FFom-ONCOR CENTER Ig?~g~gSQ2~ T-29t P O0~/OOZ F-665
Larry Redick
PMDS Project De3igne¢
On¢or Electric Delivery
Company
1015 HuEon
Oar~l]~n. Tex@$ 75000
Tel 972-323-8917
¢ax972-323-8925
Iredick~oncorgroup.com
April 23, 2004
Keith Marvin P.E.
Civil Engineer
City of Coppe[1
255 Parkway
Coppell, Texas 75019
Dear Mr. Marvin
Oncor Elcctric Delivery has no tXacilities conflicting with the Coppell Ro;~d / Service Center Sewer
C.LP. Project SS02-01. The facilities serving the service center are on th,: north side of the service
center.
Sincerely,
Larry Redick
PMDS Project Dcsigner
19725238925
CENTER 1~§ T-~$1 P ~1/~ ~-~
Fax Cover
Company
Date: ~tpril 23, 2004
To-' Keith Marvin P.E.
Company: City of Coppell Fax: 972-304-3570
From: Larry Redick Phone: 972-323-8917
Dept: Irving Servicc Center Fax: 972-3_a-8925
Re: oad/Service Ccnter Sewer C.I_P. Proje ~ SS0 __
Keith,
Here is the letter you requested.
ri/.
If any pages are not received, please call: 972-323-8917
Number of pages (include cover page): 2
nelworks
April 1, 2004
The City of Coppell
255 Parkway
P.O. Box 9478
Coppell, TX 75019
Attn: Scott Latta
Re: Coppell Road / Service Center Sewer - C.I.P. Project SS02-01
Dear Mr. Latta:
Please be advised that I have reviewed the details of your project in Coppell, TX and
have determined that there is no conflict with the 360networks/TA conduit and cable
system at this location.
I am retaining the documentation you forwarded for my files and appreciate the
notification.
Please contact me at (972) 831-0753 if you have any questions.
Kind regards,
360networks inc.
Allen Hemrich
Project Manager
COPPELL
February 12, 2004
VERIZON COMMUNICATIONS
2094 McGee Ln.
Lewisville TX
RE: Coppell Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.)
Project #SS 02-01
Utility Locations
Dear Mr. Holland:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If you have any additional questions, please feel free to contact the Engineering
Department at 972/304-3679.
Sincerely,
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
MUNICIPALITY PROJECT RESPONSE LETTER 2/18/2004
Municipality:DALLAS
Project Name: Coppell Rd./Service Center Sewer
Project Number:CIP Project SS02-01
Project Manager
Work Order Date:
Mapsco:11D
Wire Center:GTE-Coppell
SBC Engineer:.Liz Cantu-214-745-2976
Log OCOCOP0204-1
Peter J
Russell
MANAGi--_R ~r..~_~4~'~)
Utility Coordination
3 SBC Plaza, Rm. 2124
Dallas, TX 75202
(214) 464-4095
SBC ENGINEER: PLEASE COMPLETE FORM AND RETURN WITHIN 7 DAYS
Regardless of the selections made below, it is the Municipality's responsibili~, to call one
call, 1-800-344-8377 to have all utilities located.
[] We are returning your prints with the ~ of SBC facilities marked in red.
Ve have no facilities within the limits of construction.
[] We have [] aerial [] buried [] conduit facilities that appear to be clear.
[] We have [] aerial [] buried [] conduit facilities in conflict.
(Please contact our engineer to coordinate any necessary relocation)
[] Utility Adjustments and/or relocations appear to be required for this project, but payment for the
adjustments and/or relocations must first be received. SBC will begin the required work for the
adjustments and/or relocations upon receipt of payment of the anticipated costs or the execution of
an agreement regarding payment. Please call 1-800-662-8922 to initiate this process.
Based upon the most recent prints we received from you on , the estimated time requirement for
clearing our adjustments and/or relocations out of the area of proposed work is as follows:
[]
[]
[]
[]
workdays after [] all required ROW is cleared [] Final plans are received.
work days after Power Company facilities are clear.
work days after CATV facilities are clear.
work days after other facilities are clear.
[] Other conditions:
The estimated time requirements set forth herein are provided as a courtesy only and constitute
Southwestern Bell Telephone Company's estimate, as of this date, of the time which may be required to
perform the proposed work. Additional time may be needed as the result of unforeseeable and
unanticipated factors or events. Southwestern Bell Telephone Company provides this estimate to you
with the understanding, and on the condition that you understand, that it is not a commitment to
~erform the work within these time estimates or to perform the work at alL
AboveNet-
9?2??88990
MFH DALLAS OPS
H0.847
P.1/2
Sent via Facsimile
(972) 304-3673
February24,2004
Kenneth M. Griffin, PE
Director of F_,n~neerillg/Public Works
City of Coppell
255 Parkway
P.O. Box 9478
Coppell, TX 75019
Coppell Road / Service Center Sewer Main Project (Coppell Rd to Grapevine Creek)
Project #SS 02-01
Utility Locations
Dear .Mr. Griffin,
Thank you for your notification of the above referenced project. Please be advised that
AboveNet does not have a presence within the above referenced scope of work, Should your
project plan change, please send notification using thc contact inforrBation provided below.
If you require any further information, please contact Tommy Capps at (972) 778-8907.
Project Coordinator
j aniee.seott~abovemet
Enclosure
5080 Speclxum Drive, Sult~ 800W · Addison, TX 75001 · TF.L 972-778-8900 · FAX 972-778-8990
FEB.17'2004 14:58 2149228856
AT&T LOCAL ACCTG
CO?F-Ei L
#0104 P.001/001
February 12, 2004.
AT&T LOCAL NETWORK SERVICES
Michael J. Early
4100 Brian Street, Ste 615
Dallas, TX 75240
RE: Coppcll Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.)
Project #SS 02-01
Ulility Locations
Dear Mr. Early:
Please review and mark-up the enclosed set of plans with your utility locations a~d
resubmit them hack to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comm.ent as to any precautions that should be taken to
protect your utilities. :
If you have any additional questions, please feel flee to contact thc Engineering
Department at 972/30a-3679.
Sincerely,
Kenneth M, Griffin, P.E.
Director of Engineering/Public W~rks
Office 972/304-3686
Fax 972/304-7041
Enclosure
02/16/'2004 MON 15:04 FAX ~001/001
COFFELL
Febm~y 12, 2004
COSERV Electric, Gas & Communications
Roy Busby
7701 S. Stemmons
Corinth, TX 76210-1842
RE: Coppell Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.)
Project #SS 02-01
Utility Locations
Dear Mr. Busby:
Please review and mark-up the enclosed set of plans with your utility locations and
resubmit them back to the City of Coppell Engineering Department with any comments
as soon as possible. Also, please comment as to any precautions that should be taken to
protect your utilities.
If you have any additional questions, please feel flee to contact the Engineering
Department at 972/304-3679.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosure
February 18, 2004
Kenneth M Griffin, P.E.
Director of Engineering/Public Works
255 Parkway
Coppell, TX 75019
972-304-3686
RE: Proj #SS 02-01 / Coppell Road / Service Sewer Main
Utility locations
Dear Kenneth,
Thank you for your recent request for our utility locations in regards to the above referenced project. This
letter serves as notice that McLeodUSA (formerly CapRock Communications) does not cmxently have
facilities within the City of Coppell, TX. Although a permit to construct a fiber optic cable system was
obtained in 2000, the system was never built.
Please call me at 972-361-2366 if you have any questions or concerns.
Sincerely,
15601 DALLAS PARKWAY, SUITE 700, ADDISON, TEXAS 75001
Phone 972-361-2366 · Fax 972-361-2300