Loading...
SS0201-CS040224Ol-OB-03 lZ:4Gpm FFom-ONCOR CENTER Ig?~g~gSQ2~ T-29t P O0~/OOZ F-665 Larry Redick PMDS Project De3igne¢ On¢or Electric Delivery Company 1015 HuEon Oar~l]~n. Tex@$ 75000 Tel 972-323-8917 ¢ax972-323-8925 Iredick~oncorgroup.com April 23, 2004 Keith Marvin P.E. Civil Engineer City of Coppe[1 255 Parkway Coppell, Texas 75019 Dear Mr. Marvin Oncor Elcctric Delivery has no tXacilities conflicting with the Coppell Ro;~d / Service Center Sewer C.LP. Project SS02-01. The facilities serving the service center are on th,: north side of the service center. Sincerely, Larry Redick PMDS Project Dcsigner 19725238925 CENTER 1~§ T-~$1 P ~1/~ ~-~ Fax Cover Company Date: ~tpril 23, 2004 To-' Keith Marvin P.E. Company: City of Coppell Fax: 972-304-3570 From: Larry Redick Phone: 972-323-8917 Dept: Irving Servicc Center Fax: 972-3_a-8925 Re: oad/Service Ccnter Sewer C.I_P. Proje ~ SS0 __ Keith, Here is the letter you requested. ri/. If any pages are not received, please call: 972-323-8917 Number of pages (include cover page): 2 nelworks April 1, 2004 The City of Coppell 255 Parkway P.O. Box 9478 Coppell, TX 75019 Attn: Scott Latta Re: Coppell Road / Service Center Sewer - C.I.P. Project SS02-01 Dear Mr. Latta: Please be advised that I have reviewed the details of your project in Coppell, TX and have determined that there is no conflict with the 360networks/TA conduit and cable system at this location. I am retaining the documentation you forwarded for my files and appreciate the notification. Please contact me at (972) 831-0753 if you have any questions. Kind regards, 360networks inc. Allen Hemrich Project Manager COPPELL February 12, 2004 VERIZON COMMUNICATIONS 2094 McGee Ln. Lewisville TX RE: Coppell Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.) Project #SS 02-01 Utility Locations Dear Mr. Holland: Please review and mark-up the enclosed set of plans with your utility locations and resubmit them back to the City of Coppell Engineering Department with any comments as soon as possible. Also, please comment as to any precautions that should be taken to protect your utilities. If you have any additional questions, please feel free to contact the Engineering Department at 972/304-3679. Sincerely, Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Enclosure MUNICIPALITY PROJECT RESPONSE LETTER 2/18/2004 Municipality:DALLAS Project Name: Coppell Rd./Service Center Sewer Project Number:CIP Project SS02-01 Project Manager Work Order Date: Mapsco:11D Wire Center:GTE-Coppell SBC Engineer:.Liz Cantu-214-745-2976 Log OCOCOP0204-1 Peter J Russell MANAGi--_R ~r..~_~4~'~) Utility Coordination 3 SBC Plaza, Rm. 2124 Dallas, TX 75202 (214) 464-4095 SBC ENGINEER: PLEASE COMPLETE FORM AND RETURN WITHIN 7 DAYS Regardless of the selections made below, it is the Municipality's responsibili~, to call one call, 1-800-344-8377 to have all utilities located. [] We are returning your prints with the ~ of SBC facilities marked in red. Ve have no facilities within the limits of construction. [] We have [] aerial [] buried [] conduit facilities that appear to be clear. [] We have [] aerial [] buried [] conduit facilities in conflict. (Please contact our engineer to coordinate any necessary relocation) [] Utility Adjustments and/or relocations appear to be required for this project, but payment for the adjustments and/or relocations must first be received. SBC will begin the required work for the adjustments and/or relocations upon receipt of payment of the anticipated costs or the execution of an agreement regarding payment. Please call 1-800-662-8922 to initiate this process. Based upon the most recent prints we received from you on , the estimated time requirement for clearing our adjustments and/or relocations out of the area of proposed work is as follows: [] [] [] [] workdays after [] all required ROW is cleared [] Final plans are received. work days after Power Company facilities are clear. work days after CATV facilities are clear. work days after other facilities are clear. [] Other conditions: The estimated time requirements set forth herein are provided as a courtesy only and constitute Southwestern Bell Telephone Company's estimate, as of this date, of the time which may be required to perform the proposed work. Additional time may be needed as the result of unforeseeable and unanticipated factors or events. Southwestern Bell Telephone Company provides this estimate to you with the understanding, and on the condition that you understand, that it is not a commitment to ~erform the work within these time estimates or to perform the work at alL AboveNet- 9?2??88990 MFH DALLAS OPS H0.847 P.1/2 Sent via Facsimile (972) 304-3673 February24,2004 Kenneth M. Griffin, PE Director of F_,n~neerillg/Public Works City of Coppell 255 Parkway P.O. Box 9478 Coppell, TX 75019 Coppell Road / Service Center Sewer Main Project (Coppell Rd to Grapevine Creek) Project #SS 02-01 Utility Locations Dear .Mr. Griffin, Thank you for your notification of the above referenced project. Please be advised that AboveNet does not have a presence within the above referenced scope of work, Should your project plan change, please send notification using thc contact inforrBation provided below. If you require any further information, please contact Tommy Capps at (972) 778-8907. Project Coordinator j aniee.seott~abovemet Enclosure 5080 Speclxum Drive, Sult~ 800W · Addison, TX 75001 · TF.L 972-778-8900 · FAX 972-778-8990 FEB.17'2004 14:58 2149228856 AT&T LOCAL ACCTG CO?F-Ei L #0104 P.001/001 February 12, 2004. AT&T LOCAL NETWORK SERVICES Michael J. Early 4100 Brian Street, Ste 615 Dallas, TX 75240 RE: Coppcll Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.) Project #SS 02-01 Ulility Locations Dear Mr. Early: Please review and mark-up the enclosed set of plans with your utility locations a~d resubmit them hack to the City of Coppell Engineering Department with any comments as soon as possible. Also, please comm.ent as to any precautions that should be taken to protect your utilities. : If you have any additional questions, please feel flee to contact thc Engineering Department at 972/30a-3679. Sincerely, Kenneth M, Griffin, P.E. Director of Engineering/Public W~rks Office 972/304-3686 Fax 972/304-7041 Enclosure 02/16/'2004 MON 15:04 FAX ~001/001 COFFELL Febm~y 12, 2004 COSERV Electric, Gas & Communications Roy Busby 7701 S. Stemmons Corinth, TX 76210-1842 RE: Coppell Road / Service Center Sewer Main Project (Coppell Rd. to Grapevine Ck.) Project #SS 02-01 Utility Locations Dear Mr. Busby: Please review and mark-up the enclosed set of plans with your utility locations and resubmit them back to the City of Coppell Engineering Department with any comments as soon as possible. Also, please comment as to any precautions that should be taken to protect your utilities. If you have any additional questions, please feel flee to contact the Engineering Department at 972/304-3679. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Enclosure February 18, 2004 Kenneth M Griffin, P.E. Director of Engineering/Public Works 255 Parkway Coppell, TX 75019 972-304-3686 RE: Proj #SS 02-01 / Coppell Road / Service Sewer Main Utility locations Dear Kenneth, Thank you for your recent request for our utility locations in regards to the above referenced project. This letter serves as notice that McLeodUSA (formerly CapRock Communications) does not cmxently have facilities within the City of Coppell, TX. Although a permit to construct a fiber optic cable system was obtained in 2000, the system was never built. Please call me at 972-361-2366 if you have any questions or concerns. Sincerely, 15601 DALLAS PARKWAY, SUITE 700, ADDISON, TEXAS 75001 Phone 972-361-2366 · Fax 972-361-2300