CF-Denton Creek Trail-LR040221TEAM Consultants, Inc.
Geotechnical, Environmental, Construction Materials Testing
CONCRETE STRENGTH REPORT
(ASTM C-39), (ASTM C-78), (ASTM C-298) OR (TEX-418-A), (TEX-448-A)
Mr. Steve Jeske DATE: 02/21/2004 REPORT NO.: 38/43
Jeske Construction Company JOB NO.: 035225
P.O. Box 59025
Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor
Hike and Bike Trail
Cyl or Slump(in.) Air (%) Strength (psi)
Beam Date Date ASTM ASTM 28-Day
No. Location Break Made (C-143) (C-231) 7-Day 28-Day Specs.
11- A Sidewalk at Frisbee Golf 01/27 01/20 4.50 3.50 (3420)~.~ --
B 01/27 01/20 (3450/~ -~
C 02/17 01/20
D 02/17 01/20
12- A Retaining wall, northwest 01/28 01/21 .... (1900) '~- --
B comer (mortar cubes) 02/18 01/21 2550
C 02/18 01/21 2450
13- A 12'jogging track, 150' 01/30 01/23 5.25 5.75 (2300) --
B north of existing track, 01/30 01/23 (2160)
C west side of lake 02/20 01/23 3520
D 02/20 01/23 3640
Conical fi:acture on cylinders unless otherwise noted.
Cylinder diameter 6.00" unless otherwise noted.
Area of cylinder 28.27 sq. in. unless otherwise noted.
lrf
cc: City of CoppelI Parks/John Elias
City o £ Coppell Parks/Larry Davis
TBO Partners, Tom Woiiver
By:
TEAM Consultants, Inc.
Timmy Wooley
2970 S. Wcdtot~ ~dket; Suite ]Ol Dall~ls, TX 7521l (214) 331-4395 Frtx (214) 33l 4458
3101 Ple~tsant V~tlley, Stdte 101 Arlittgtot~, TX 76015 (817) 467-5500 Fax (817) 468-9920