St Andrews Est-CS040227 T H E C 1 T Y O F
COPFELL P.O.Box 9478
Parkway Blvd
pell,TX 75019
Phone:(972)304-3679
jFax (972)304-7041
A 8 s
1-s' S
ENGINEERING i
I E c�
NG N EKING DEPARTMENT
FAX COVER SHEET
To: Terry Holmes From: Keith R.Marvin,P.E.
Fax: 972-242-1770 Date: 2-24-04
Phone: 972-242-2931 Pages: 2 (including cover sheet)
Re: Early Grading Permit CC:
❑ Urgent IiFor Review ❑ Please Comment ❑ Please Reply ❑ As Requested
•Comments:
Terrv,
Transmitted herewith are my comments on the Early Grading Permit application.
Please send us enough sets of the grading plan set so the city can have two sets, and so
you have enough for the contractors. Once we have those,we'll release the permit. At that
point you'll need to set up a preconstruction conference with Larry Davis.
Feel free to call me to discuss any additional questions you may have.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL(972)304-3679
"City of Coppell Engineering-Excellence By Design"
COP?ELL
February27,2004
Terry Holmes
The Holmes Builders
1406 Halsey Way, Suite 100
Carrollton TX 75007
RE: St. Andrews Estates
Early Grading Permit
Dear Mr. Holmes:
The City of Coppell has received the permit application, the plan, and all information needed to
review the Early Grading Permit and we have the following comments to offer:
I. The cover sheet should state "For Early Grading Only."
2. Due to the floodplain issues on this lot, we will require that you flag the limits of the
floodplain as they are currently shown on the map. That way our inspector can ensure that
there is no grading, filling or excavation work being done within the limits of the floodplain.
3. No permit for the storm drainage work is being issued at this time, only the fight to fill some
of these lots. Ensure that drainage across this property from the adjacent property continues
in its present pattern while this grading work is being completed.
4. You need to ensure that any existing sanitary sewer or water service is plugged or taken out
of service to avoid inadvertently placing materials within those systems.
5. Ensure that all erosion and sedimentation control devices are set up properly to avoid
stormwater contamination.
At this point the City needs for its use two copies of the revised and approved plans, and any
copies that are needed by the contractor. We will stamp and sign each set, and return the ones
for the contractor with the permit. All contractors working on the site need to have the stamped
approved set of plans.
Sincerely,
Keith R. Marvin, P.E.
Civil Engineer
Office Phone: 972-304-7044
Fax: 972-304-3570
255 pARKWAY ~ P.O.BOX 9478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 ~ FAX 972/304 3673