Loading...
Mercantile-CS040301COl'FELL March 1, 2004 Darryl Miller Pacific Builders 3360 Wiley Post Rd, Ste 100 Carrollton TX 75006 Fax972/866-9090 Mercantile Addition, Phase 1 Final Acceptance Conditions Dear Mr. Miller: On February 17, 2004 a walk-through inspection was conducted for the referenced project. It appears that all punchlist items have been completed. At this time, the remaining requirements for sign-offon the CO must be supplied. They are as follow: 1. Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public right-of-way and easements for a 2-year period beginning on the date of final acceptance. 2. Provide record drawings of the public improvements from the engineer to be submitted to City of Coppell Engineering Dept. (See attachment). Once these items have been received, reviewed and accepted, I will sign offon the CO and send a final acceptance letter. If you have any questions, please call me at 972/304-3679. Sinc. oere~, ! Rick O Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 CC; Kenneth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Vernon Gilmore, Acting Fire Marshal Attachment