Loading...
DR9306-CS 941026Fq SCON', o. October 26, 1994 M~-. Garreth Campbell City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Stream G-6/Bethel School Road Drainage Improvement DR 93-06 Dear Garreth: Please answer the foil. owing questions I have about the referenced project: 1. What is the thickness of the pavement for Bethel School Road? 2. Will lime subgrade stabilization under the concrete pavement be required? 3. How is the removal and replacement of the sidewalk adjacent ko Bethel School Road paid for? 4o Dees the City have a detail of the me~al guard rail? 5. Ks the City sure there is no conflict with the Sanitary Sewer Manhole in Bethel School Road and the proposed 10'X6' Box Culvert? 6. How is the removal of the shrubs from Station 8+25 to Station i1+60 paid for? Are these shrubs supposed to De replaced by the Contractor? if s~, how wii~L the~ be 7. Are the entire treated timber planter 'walls supporting the 9reviously m~ntJ_oned shrubs to be removed? 8. What kind of ~rading and clearing ~o we have to perform to install ~he 18" Rip-Rap at Station 0+00? 9. Is there any available access using the utility easement which crosses Station 0+50? i0. How does 'the Gabion Wall tie-in to the existing Masonry Wall at Station 10+007 il. Which 37 trees are designated, for removal? I'd like to know the diameters and the locations. 1888 W. NORTHWEST HWY. DALLAS, TEXAS 75220 214/444-8230 12. What is the smallest diameter of tree the City will pay for under the Tree Removal item? 13. Please define Heavy Equipment? 14. Will landscaping removed during construction have to be replaced other than the grass? 15. What is the City's budget for this project? I heard $200,000.00 from a property owner. If the low bid is over the City's budget, will a contract be awarded? Thank you for your time and help in answering these questions. Sincerely, REBCON, INC. Robert C. Bibby P. 82 /etcher ~6, p 0. 4?8 / / / Dra.~pa~m I~p ~el School Roa~ the followi~questions I have the refere /7 1. What is the thickness of the pavement for Bethel School Road? 2. Will lime subgrade stabilization under the concrete pavement be required? - J~3 ¢~~r~' 6~%;~'~t'~' '~ ~''~ OP'~t~'~ 3. ~ow is the removal and replace~nt of the sidewalk adjacent to Bethel School Road paid for? ~ 4. Does the City have a detail of the metal guard rail?~ 5. is the City muze there ~s no conflict with the Sanitary Sewer 6. ~ow is the removal of the shrubs from Station 8+25 to Station 11+60 paid for? ~e thes~ shrubs supposed to be replaced by the Cpntractor? If so, how wzll they be pai~ for? '' ' ~~ ~]~'r~ th. entize rrm%ted ti~mr ~1.~-= w~ii, supporting the previously mentioned shrubs to be removed? ~'.~ 8. what kind of grading and clearing do we have t0 peri0rm to install the 18" Rip-Rap at Station 0+007 ~ ~: --' J> 9. Is there any available access using the utility easement which crosses Station 0+50? 10. How doe& the Gabion Wall tie-in to the existing Masonry Wall at Station 10+007 ~ f~ ~ ~,'Jg. 11. ~ich 37 trees are designated for removal? I'~ like to know the di~eters and the locations. ~5 ~ ~. ~ ~ ~ 186B W, NORTHWEST HWY, OALLAS, TE~XA~q 75220 ~14/444-B~30 12. What is the smallest diameter of tree t_.he City will pay f,or ,. under the Tree Removal item? ~- ~ ~ ~ ~ 4" .~ %~ ,~IvD/,~ 13. Please define Hea~ Equipment? ~ ~ ~;A~ 14. Will landscapin~ r~oved during construction have to~'~ replaced other than the grass? ~ ,:,. , ' . ~ 15.~>What is the City' s budget for this project? I heard $200,000.00 from a property owner. %>If the low bld is over the city' s budget, will a contract b~ awarded? Th~k ~u for your~ime and help In answermng theme questxons. )NC INC. Rob~