Loading...
DR9306-CS 950810i0 August 1995 M.A.VINSON CONSTRUCTION CO. P.O.BOX !8557Y FORT WORTH, TEXAS 76181 817-284-9802 INC. Constructzon inspector City of COppeii P.O. SOX 478 Coppeii, Eexas 75019 Stream G-6 Bethel School Road Project DR 93-06 Change Order # 2A We request a change order on the pro~ect (DR 93-06), to cut and DiOCK exlsting 8" water i!ne, on Doth s/des o2 cuivert,!n the north quadrant of Betnei School Road. Remove water ilne to allow piacing of new culvert to the west s!de of old box culvert. Then piac~ng new 8" D.I. wa~er ilne over the top o~ Oot~ culverts and tie!ng DaCE lnto existing water line. Tnls change order also lnciudes the moQificat~on to t~e DOX Culvert at t~e sewer manhole on the south quadrant, west s~de o2 0ox, and using asphalt to open the sout~ naif o2 Betnei School Road to t~a~fic, wh~ie rema!nder o2 culvert, remove and replace sldewsik north side ~ and water ii'i-he"are insta~le~. '"' We propose to do the complete change order for t~e lump sum o2 n!neteen tnousan~ seven hundred seventy five dollars and no cents(S!9,??5.00) . We are request!ng an a~!t!onai twenty(20) ~ays to ma~e correct!ohs requlre~ to make the c~anges. Water z~ne reiocat~on descrzpt~on and requzreC materla~s. STEP D~SCRIPTiON MATERIAL i C~t & Plug Each end. Plugs and concrete 2 Ductile Iron P~pe(8") Approx. 80 LF 2 Bends 45 deg {~") 4 EA 4 Reta!nlng GianQs (8") lo EA 5 Sleeve 12" Long (8") i 5A 6 Co~crete ~-oc~!ng As Req]llre~ M.A. Vlnson Construction Go.