Loading...
ST9302-CS 971027City of Dallas October 27, 1997 VIA FAX ANDMAIL Ken Griffin, P.E., City Engineer P.O. Box 478 255 Parkway Boulevard Coppell, Texas 75019 Thru: Hamid Baha, P.E. Acting Project Mamager Re: Interlocal Agreement for Sandy Lake Road Dear Mr. Griffin: We have reviewed the draft of the ILAfor the Sandy Lake project as provided by your office on October 15, 1997, a copy of which is attached. We are submitting the following revisions for your consideration: For Section II, we propose the following wordings: "Dallas agrees to provide all funding for the cost of the City requested items. Subsequent to Coppell receipt of construction contract bids and prior to the award of such contract, Coppell shall notify Dallas of the total cost of construction of Dallas funded items as determined by the unit bid prices for the Dallas funded quantity of work cost. Dallas shall encumber such amount, establish an escrow account and shall deposit funds equal to the total cost of construction in said account prior to the award of construction contract. Coppell will bill Dallas on a monthly basis based upon actual Dallas funded work performed during the the month. Dallas agrees to pay such billing within thirty (30) days of receipt of monthly billing. Upon completion of the project, Coppell will do a final accounting of the cost of Dallas funded items. In the event that the amount paid by Dallas exceeds the actual cost, the difference will be remitted to Dallas. In the event that additional funds are due, Coppell will bill Dallas who agrees to pay such funds within thirty (30) days of receipt of such billing. For Section IV, replace the word "control" with "assurance", as indicated on the attached copy of the draft. For Section VI, insert the phrase "design of the project and", as indicated on the attached draft. Water Utilities Department Development Services · 320 E. Jefferson, Room 218 · Dallas, Texas 75203 · 214 / 948-4590 A city utility providing regional water and wastewater services vital to public health and safety. October 27, 1997 Ken Griffin Page 2 For Section VIII, replace the title "Construction Engineer" with ,,Project Manager", as indicated on the draft. For Section X, insert the phrase "and construction change orders"; and add the sentence ,'Fundings for all change orders shall be in accordance with Section VII through IX.". For Section XI, revise the signatory block as shown. Please send us a revised draft as soon as possible for our attorney's review. We appreciate your continuing support regarding this matter. Feel free to call me at 948-4591 if you have any questions. Sincerely, c: J. Milstead File Project Engineer Services/Relocations C]T~ OF COPPELL ENGINEERING N0.995 THE STATE OF TEXAS COUNTY OF DALLAS WI~,_R~EAS, the City of Dallas, Texas hereinafter called "l~__ng~,' and the Cit~ of Coppell, Texas, hereinafter called "CoppeU", wish to enter into nn Agreement for the construction/relotmfion of DaHas's 30" water main and adjustment of Dallas, 's existing water appurtenances located W~_'thin the City. limits of the City of Coppert along and paralld to Sandy Lake Road between Denton Tap Road and MacArthur Boulevard; and WHEREAS, the Interlocal Cooperation Act, Chapter 791 of the Texas Government Code, provides authorl-m~on for any local gOVernmelit to contract with one or more local governments to perform govcrnmontal functions and services under the terms of tumid Act; NOW THEREFORE, this Agreement is hereby made and entered into by .the Cities of Dallas and Coppea for the m.n. tllaJ eon.~ideration stated herein: Dallas hereby requests Coppen to ~onstruct pursuant to the te,-~s of this Agreement Dallas's new water facilities located along and parallel to Sandy Lake Road between Denton Tap Road and MacA~ur Boulevard. Coppell droll also, in connection with such facilities, relocate or adjust its own water and wastewater appurtenances, and provide sidewalks, ~reet lighting facilities and specific traffic control devices for and in conjunction with 88:20 CITY OF CDPPELL ENGINEERING ~ 2i4 948 4599 NO.993 CeppeH's construction of paving and drainage improvements in the City of Coppell on Coppell's Sandy Lake Road Project No. ST 93-02. i' Dallas hereby allrees to provide funding in the estimmted amottllt Of $ jn aceor with Attachment "~k**, for the cost of design, construerio ---~ adjustment and b t of certain improvements described h . Coppell my require  Dallas funding to be adj subsequent to bid o ' based on bid prices for the quantities of work included in the bl ' sal r to award of the construelion contract. C · will deliver all a funds to Coppell prior to the letting of '~ any work to Dallas hereby reserves the right to review any or all of the bid proposals submitted for Dsltas's construction and to reject the same due to irregularities, unbalanced bid items, or in.~3dfjcient funds for awarding or for any other reason. Dallas hereby agrees to provide,' through Dallas's Water Utilities Department, inspection and. quality4~-tt'^Hestint for constrm.-tion of Dallas Water Utilitie~ items in coordination with Coppel], thr~ CoppeH's En_~-eering Department. i~./!5-'S? 0B:20 CITY OF COPPELL ENGINEERING ~ 214 948 4599 N0.9~3 · ..,m,-. ~,,,,~ Ve Dallas hereby agrees to be responsible for approval of all design changes and to provide for any additional funding necessitated thereby, or for any increase in the quantity of Da!las's construelion. Copped hereby agrees t~ provide for th~administratlon of the construction contract including advertisement for bids and award of contract. Copped hereby agrees to have D~__!_l~s xA~ater construction performed as def'med by and in accordance with the plans and contract doc-me-nts, the North Central Texas Council of Governments Standard Specifications for Public Works Construction (S__s~_nd Eaj. don 1987), as amended, and Da_n--~ Water Utilities Standard Drawings, DetaiLs and Appurteances for Water and Wastewater PipelSe Construction Methods and Dallas Water Utilities Addendure to the Standard Sped~eafiom dated July, 1995. Coppell agrees that it will not make any payment, progress or f'real, to the construction contractor perform|hE Daltas's water construction under this Agreement unt~ construction has beam approved in writing by/)alias. Coppell agrees that all payma~ts to the construction contractor Sh-U be hasand on measured quantitim of construction completed as furnished to Copped by Dnlt~'s Water Utilities Department , ,g,l~u E.. 08:20 CITY OF CO;'PELL ENgiNEERING -~ 2i4 946 4599 ~.993 Coppell hereby agrees that construction will not commence until this Agreement been fully executed by Dallas and Coppetl. ' ~~/~L.- Coppell he y agrees to itmnediately advise DR!I_~_~ of any and all design changes Coppell hereby agrees to credit Dallas for any decrease in quantities of construction upon completion and f"mal acceptance of the work by Dallas and to return to DaI!~, all funds provided but not used for the work under this Agreement. Executed this the day of , 199/, by Dallas, si~nin~ by ~n_d through its City Manager, duly authorized to exmcote same by Resolution No. adopted by the City Council on ,1997, and by Coppill, pursuant to Resolution No. ._. , adopted by the City Council on . ._ ,1997. CITY OF DALLAS JOt~ L. WARE~ CITY MANAGER CITY OF COPI~J-L JI3t W1Tf, CITY M~AGER BY: City Manager BY: City Manager APPROVRn AS TO FORM: