Loading...
First Baptist-LR040309Consl~nlctio~ l~terlal~ Te~ting and Environmental Coosuhlng Texas CMT, Inc. P.01/01 10044 MourOe Drive Della*, Texas 75229 (214) 352-6957 ' Fax (214) 352.6972 REPORT OF CONCRETE MIX OBSERVATION March 9, 2004 Date Concrete platte: Ma/ch 2, 2004 First Baptist Church of Coppeli First Baptist Church of Coppell West Side Construction Redi Mix 1 Sidewalk Area 28,27 Square lnch~ Con¢~Ct¢ Report No,: Project No.: 203 -016 MATERIALS Mix Number' Fly Ash: Coarse Ag~resato: FBC 194 FBC 195 6Vi" FBC 196 OBSERVATION DATA 28 I 03/30/04 H [ HOLD Time Sample Batch~: Tirn~ Sampted: Sample Locationt TmclETicket ~biem ~: 56'F Concrete Range; 60'F Stump ~ge (inch~s): To~ Cubic Y~ds 90,840 Cy. linde, rs Made 08:50 am 09:26 am S,~cqion 15' Ions, ninth of SW ~pproach - sidewalk west of building 232/125232 AB R~marl~ and/or Dis~butiou: Mr. i. W. 14des, c/o Kamen White - First Baptist Church of Coppoll Mr, Jim Stewart - H H Architects . Mr. J~Jncs Starling (2) - s~ling. Rich~dson Constmcuon Mr. W 5teven pri~ - Datum Engine.s Mt. Lee gmne - F~' 972-3~-3514 Mr. La~ Davis = F~: 972-304-3570 - Post-it' Fax Note 7671 Date p~ge$ _ TOTAL P.O1