Loading...
ST9905-CS040311 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To; Date: RE: Kenneth M. Griffin, P.E., Dir. of Engineering/Poblic Works Suzan Taylor, C.I.P. Coordinator March 11, 2004 ST 99-05 / Bethel Road The design status of Bethel Road is as follows. Design Plans P, oadway 1. TranSystems will send two full size copies of the 90% review plans next week. Will have comments back to them by May 1, 2004. Channel 1. TranSystcms is working on the desigm of the channel. There is a portion of the channel, between Bethel Road and Coppell Road, where the riow will top the channel. Drainage easements have not been prepared. Right of Way Acquisition Parcels Remaining Roadxvay 1. Parcel#3 Walter Hogg Partnership (ROW/SE/TCE) Probable condemnation - what is our next step? 2. Parcel#4 DFW Airport (ROW/SE/TCE) Approved by DFW Board will receive documents for City's execution next week. 3. Parcels #6, #9, #11 Texas Dugan Limited Partnership (ROW/TCE) Sent Brook Barefbot exhibits showing the removal of the westbound free right-hand turn lane along Bethel Road at Freeport Parkway. Will set up meeting with B. Barefoot to acquire the easements once he approves of exhibits. Will have TranSystems revise easement for comer clip only at the northeast comer of Bethel/Freeport intersection. 4. Parcel #8 - Minyard Food Store (ROW/TCE/DE) Will send another letter to ask about thc status of the easements. Channel I. Eight Parcels lYtilitv Relocations 1. Explorer Pipeline 2. Need to acquire all of' the right-of-way prior to initiating thc relocations. Interlocal Agreement with the Town of Grapevine "CITY OF COPPEIA~ ENGINEERING - EX( ELLENCE BY DESIGN"