Loading...
SS9402C-LR 961106Ellerbee-Walczak, Inc. CONSTRUCTION MATERIALS TESTING REPORT NO.: REPORT OF: FOR: PROJECT: DATE: NO. PROC % MOIST: 1 I 8.1 2 1 8.7 3 1 7.3 4 1 7.9 PB194den. doc In Place Density Tests Utilizing Nuclear Gauge Pate Bros. Construction Bethel Rd. 11/6/96 % DRY DENLOCATIONS 96.2 97.8 97.0 95.9 BETHEL ILD. STREET REPAIR ON SAN. SEWER AT GRADE 100' east of Freeport Pkwy. 105' east of Freeport Pkwy. 110' east of Freeport Pkwy. 115' east of Freeport Pkwy. PROCTORS USED: #I - 105.7 PCF ~ 8.5% Pate Bros. Coppetl Ronald A. Ellerbee, C.E.T. 6900 So. Freeway, Suite A-1 * Fort Worth, Texas 76134 Laboratory: (817) 293-0111 * Fax: (817) 596-0941