Loading...
SS9402C-LR 960215REPORT NO.: REPORT OF: FOR: PROJECT: DATE: PB085den.doc In Place Density Tests Utilizing Nuclear Gauge Pate Bros. Construction Bethel Rd. 2/15196 NO. PROC % MOIST. 1 3 10.8 2 1 13.5 3 3 13.7 4 3 11.2 5 3 10.9 6 3 11.6 7 3 8.1 8 3 7.2 9 1 13.8 10 3 11.1 11 2 19.8 12 2 20.6 % DRY DENLOCATIONS I00.1 98.9 101.2 99.8 97.8 98.4 99.0 101.6 97.3 100.8 97.2 98.1 SANITARY SEWER. Sta. 6+00 N. side of pipe Sra. 7+50 S. side Sra. 9+00 N. side Sra. 11+50 S. side Sra. 13+00 N. side Sra. 14+50 S. side Sra. 16+00 N. side Sta. 17+50 S. side Sta. 19+00 N. side Sra. 20+50 S. side Sra. 22+00 N. side Sra. 23+50 S. side PROCTORS USED: gl - 116.3 PCF ~ 13.6% #2 - 104.1 PCF ~ 20.2% #3 - 116.7 PCF ~ 11.4% #4 - 114.4 PCF ~6.6% Ronald A. EHerbee, C.E.T. cc: Pate Bros. Coppell 6900 So. Freeway, Suite A-1 · Fort Worth. Texas 76134 Laborato~': (817) 293-0111 * Fax: (817) 596-0941