ST9902-CS040323March 23, 2004 COFFELL Mr Matt Atkins Teaguc Nail and Perkins, lnc 12160 North Abrams Roa& Ste. 508 Dallas, Texas 75243 RE: Smady Lake Road ST 99-02 (A) 2"d Review Comments Dear Mr Atkins: Following a rexriew of the above referenced plans, the following comments are offered for your consideration: PLANS - GENERAL COMMENTS The paving plan/profile sheets need to show conduit, water line tap, and power source for the landscape irrigation in thc ~nedians The landscaping consultant NJB is coordinating with the Parks Department on this issue We do not want streetlights located in the stamped concrcte. Has TXU approved the strectlight design'? A detail of thc TXU standard street light foundation will need to be provided in thc plans or specifications We previously discussed relocating the newer fire h~,drant and valve assemblies and replacing the old fire hydrants and assemblies a The Streets Department will check fire hydrants to determine whether to replace or relocate b Valves need to remain ~n their present location The Streets Department will check valves to see if they am operable or need to be replaeed The plans call for all of thc ~xater meters to be relocated and there arc existing water meters that are not shown Thc Streets Department will locate, mark, and chcck water meters to determine whether they need to be relocated or abandoned We will need a list of the trees dcsignatcd for removal Thc trees ~vill nccd to be marked and removed prior to thc start of construction The trees will need to be removed to approximate Station 58+00. 6 GTE telephone vaults (Sheets 8, 12, & 14) located along thc north side of the roadway conflict with the proposed improvements and are difficult to relocate Has GTE commented about their proposcd relocation'~ Can thc north curb be moved 2 feet to the south to avoid the vaults? The paving plan/profile sheets need to show the following information: a high point station, elevation, and flow arrows b. top of curb elevation at all of the curb inlets The storm drain plan/profile sheets need to show top of curb elevations at all of the curb inlets. Need to coordinate the design of the roadway with furore development of the T/E Northpoint Partners, Ferguson Realty Company, and Four Seasons Addition parcels. We are currently working with the developers of the Ferguson tract Design of the storm drains and median openings, drainage casements may necd to be revised. 9. The City will check location of the gravel drives in the field to determine whether they are needed Do we need concrete aprons on the gravel drives or curb openings only? 10. Need to correct the parcel ownership on the paving plan/profilc sheets to agree with Sheet 6. I 1. Install 2" blow-offat the end of each 8" PVC stubout. Thc plugs on the 8" PVC stubouts need to be prefabricated 12. Do we want to extend stamped concrete in the narrow median sections - sheets 17, 18, and 197 13. Need sufficient detail on all ADA access ramps and sidewalks to ensure that the plans are in compliance with the Texas Department of Licensing and Regulations. This includes the correct slope, correct width, correct texture, and correct color differentiation. SHEET 2 GENERAL NOTES Note I Revise first sentence to read: "All materials and construction shall conform to the City of Coppell Standard Construction Details and specifications and these plans and contract documents" In case ora conflict between will the engineer's decision be final? 2 Note 10 Revise last sentence to read: "Any necessaw re-tests due to the failure of original tests shall be at contractor's sole expense and shall be billed directly to the contractor." Note 15 Revise note to read: "All fill areas within the right-of-way shall be compacted to 95% standard proctor density in accordance with ASTM D698 at, or up to 5 pcrcentage points above, optimum moisture content/' 4. Notc t7 All concrete for construction shall be Class "A" concrete having a nfinimum of 5.5 sacks of cement per cubic yard and a minimum compressive strength of 3,500 psi at 28 days. 5 Note 18 - Delete this note. 6 Note 25 - Change "6-inch flex base" to "6-inch compacted flex base." Add to end of' note: "Prior to processing each monthly pay request, all urgent project related issues shall be resolvcd. These may include, but are not limited to, safety, erosion, dust, noise, traffic control, ingress and egress, clean up, citizen complaints, etc." 7 Note 27 Add to end of note: "RcgulatoD' and informational signs shall remain visible throughout the construction process and may have to bc relocated multiple times" Note 34 - There needs to be a minimum of 3-feet of clearance from all obstructions around the fire hydrant SHEETS 3 & 4 i All concrete for construction shall be Class "A" concrete having a minimum of 5 5 sacks of cement pcr cubic yard and a minimum compressive strength of 3,500 psi at 28 days. 2. The maximum slope in thc parkway is 2%. 3. Thc recently constructcd section of Coppell Road is 8-inch pavement 4. Need the pavement thickness shown on the Royal Lane typical section. 5. Need a Lypical section on the State Road asphalt transition. 6. Show the flex base extending one foot beyond the HMAC on the typical HMAC transitions SHEETS 5 & 6 I Show appropriate match lines 2. Do we need a drainage easement for thc drainage structure located at approximate Station 13+50'? SHEET 7 1. Station 8+ 10.97 - Provide a grate inlet detail or change to City of Coppell standard "Y" inlet detail. SHEET 8 Do we need asphalt curb around the median in the asphalt transition in order to prov/dc proper cross4rainagc for median and provide lane delineation for traffic flow? 2 Need more information on the grading plan for proposed inlet at Station 11+21.74 The flow- line of the inlet is higher that the adjacent curb elevation 3 Sheets 8 & 21 - The streetlight conduit in the median nose of Royal Lane is shown going to the traffic box. Nccd to pour new a foundation and connect to existing wiring. TXU will need to remove the existing street light. Removal of the existing foundation will need to be addressed. 4 Sheet 8 & 21 - Elevations that should be the same on both sheets do not match. Need to ensure that matching grades and elevations are shown correctly on both Sheets 8 and 2 I. Sheet 21 Sheet 8 S.EP.l 1+10.82 S.E.P.1 12+3751 LTPI. Elev - 522.07 RT PI Elcv. - 521 65 SHEET 9 1. Drive at Station 14+3390 - Property is being developed and the drive may no longer be needed If required, change the 12-inch CMP to 15-inch CMP and show the required length. SHEET 12 1 Necd to coordinate relocation of fire hydrant at Station 26+93 north with future dcvelopment of Fcrguson tract. Show a heavy line if the fire hydrant is to be relocatcd. 2 Shoxv the 12-inch water line west of Northpoint Drive. (drawing attached) 3 Show the t?pc and the limits of the fence that is to be removed. SHEET 15 I Do we want to replace the barbw/re fence along the Callejo property? SHEET 17 Sheet 17 and 26 ~ Do we need the conduit and pull boxes at the church access? 2 The note to "Remove and Dispose of Exist 12' Curb Inlet" is confusing since there is a proposed curb inlet shown Note above shows existing 10' curb inlet. 3 Do we need a temporary construction easement on the church property since the access is not in public right-of-way? SHEET 18 Where is the fire hydrant at Station 49+30 to be relocated? 2 Can the trail be moved closer to the road so that less right-of-way is rcquired from the two residential lots? 3. Sheets 18 and 27 - Do x~e need the conduit and pull boxes at Oakbend Drive? SHEET 19 1. Install thc temporary "Y" inlet at Station 55+22 t6 RT 2 The road drains to thc handicapped ramps located on the south side Will the accumulation of water in the ramps be a problem? 3 Sheets 19 & 51 -lhe top of curb elevation (49920) on the inlet at Station 52+61 48 does not match thc elevation (49786) shown for SD LAT 'CI-I'. 4 Revise "S WP.l. 53+1368" and"SEP.l 53+49 59" to"NW.P.I. 53+1368" and "NEP.I 53+4959". 4 5 Sheets 19 and 27 Do we need thc conduit and pull boxes at Branchwood Drive? SI~EET 21 1 SEPI and SWP.I are both shown at 1+10.82 - they are not at the same station. 2 Show station ancl elevation of the existing top of curb at the tie-in to the proposed curb LT. Show the width of the proposed roadway where it ties into the existing roadway 3 Station 1 ~35.49 Royal Lane - revise "Begin" to "End Lt Curb Return". 4. Sheets 21, 22, and 23 - Is thc RCP in profile view shown to flow in the right direction? SHEET 22 I Sheets 22 & 51 - The top of curb elevation for thc inlet at Station 6+45 10 does not match the clevation (523 20) shown for SD LAT 'A2-6'. SHEET 23 1. As previously discussed, a median opening is needed for the Industrial Park Access Drive. The inlet located at Station 10+48.74 RT will need to be relocated to the south 2 Show Station 9+00 in the profile view SHEET 24 Verify existing top of curb elevation where the proposed roadway ties into the existing roadway. 2. Correct the stationing in thc profile view 3. ls the existing 20-foot inlet to the south a low point? SHEET 25 1 Veri~, existing top of curb elevations at the tie-in to the proposed curb on the LT. Show the width of thc proposed road~ ay where ~t tics into the ex~sting roadway 2 Show asphalt pavement according to the legend on Sheet 1 for the transition into State Road 3. Do we want to relocate the barbwire fence along the west side of State Road? 4 Station 2+50 State Road - provide header both left and right 5 There is a minimum width of 2 feet on an asphalt connection (approximate Station 5+00 to 5+53). 6. Install metal guardrail beam barricade at the end of the proposed concrete pavement LT., where it does not tie into the existing State Road. SHEET 26 I Explain finished pavcmcnt grade. 2 Verify existing top of curb elevations at the tic-in to the proposed curb. Show the width of the proposed roadway where it ties into the existing roadway 3. Nced to ensure that crosswalk meets the ADA requirements Are ramps and curb opening required? SHEET 27 Need to ensure that crosswalks mcet the ADA requirements on both Oakbend Drive and Branchwood Drive The both exceed the 2% maximum cross slopc. Show the width of thc proposed roadway where it ties into the existing roadway Show the station location of the inlets. SHEET 28 1 ResoNe grade diffcrences shown on this sheet and Shect 19. 2 Slope easements will be required on the Sowell property 3 The radius on the two drives located on the west needs to be 15 feet 4 Is the hike and bike trail going to extend to the intersection? 5 Show the width of the proposed roadway where it ties into the existing roadway. 6. Correct thc stationing in the profile x4cw. SHEET 34 1. Can the "Drainage Area Data" be shown with the drainage area maps? _SHEET 35 Provide detail showing minimum spacing betwecn boxes, trench foundation, matcrial, backfill bctwcen boxes, and balance of backfill material. SHEET 36 1. thickness and Arc equalizers necdcd between 7'x3' box culvert 'SD A-I' and 7'x3' box culvert 'SD A-2'? Detail the construction sequence at the Royal Lane/Sandy Lake Road intersection that x~,ill maintain two-wa,~ traffic ~hile removing the ex~st~ng _ 3 x9 box culverts, lox~ermg the existing 12-inch water line, installing two new box culverts, and constructing the pavcn~ent sections 6 SHEET 37 1 Label the storm drains SHEET 38 1. Station 0+28.54 Provide detail of Headwall (T3pe FW-0) or change to City of Coppell standard 2. Label the storm drains. SHEETS 39 & 4O t The "existing information" is upside down SHEET 41 1 Show coordinates on SD LAT 'A3-1' in the plan view. 2 The flow line of SD LAT 'A3-1' and SD LAT 'A3-2' should be the same in the profile ~iew. SHEET 44 1 The top of curb elevation of SD LAT 'A2-6' does not match the Royal Lane profile 2 Show flog' line and top of curb elevation of SD LAT 'AI-I'. 3 Title block should read "Laterals 'AI-I' Thru and 'A5-2' SHEET 45 1 The top of curb elevation of Storm Drain 'B-I' and SD LAT 'B I-1' should be the same (5~8 18). SHEET 46 I Station 4+58.54 Storm Drain 'C-2' is 24-inches and not 27-inches as shown 2. The north arrow is not orientcd corrcctly. SHEET 47 1. Label Oakbend and Branchwood Drives 2 Need profile for SD LAT 'C l-2a' and SD LAT 'C 1-2b' and SD LAT 'C l-Sa' 3 Check top of curb elevation for SD LAT 'C SHEET 48 I The top of curb elevation is not shown on SD LAT 'C 1-7' on sheet 5 7 2 Label church access drive. SHEET 50 I. Describe structure at Station 2+10 17 SD 'C-2' SHEET 77 I There is an approximate four-foot drop-off from the hike and bike trail to the edge of pavement. Should there be a buffer on the trail before it drops off. Need to ensure that trail is designed in compliance with the Parks and Recreation Department's standards SPECIFICATIONS GENERAL COMMENTS 1 Irrigation removal, repair, relocation 2. Fence removal and relocation Please revise the plan sheets as needed. Enclosed is the review set of plans, which should be returned with the nc,ct submittal Should you have any questions or nced any additional information, please contact me at 972-304-7019. Sincerely, ator Enclosures