Loading...
ST8402-CS 881222 (3)Jerry ParchE Consulting Engineers December 22, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P O Box 478 Coppell, Texas 75019 214/471-2251 RE: JP No. 88009; Proposed Median Openings; Denton Tap Road; Coppell, Texas Dear Russell: While on a visit to the City of Coppell municipal building on December 21, 1988, I noted that the subgrade on the west side of Denton Tap Road had been recently shaped and graded. It appears that paving construction is eminent. On November 3 and November 30, 1988, I sent letters to you on behalf of ABQ Development Corporation requesting that the City of Coppell include median openings in Denton Tap Road adjacent to ABQ's property in the current roadway improvement project. On November 16, 1988, you provided me a draft copy of the City's response to my November 3 letter, however, I have not yet received an executed response. Please provide confirmation that the median openings are acceptable as proposed as soon as possible and advise me of the City's requirements in order that these median openings can be constructed with other paving in this project. Thank you. Sincerely, /J~erry Parche', P.E. JP:ch CC: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Mike Allen/Univest Development Company Mr. Wayne Ginn, P.E./Ginn, Inc. 320 Westway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 OF. NION lAP ROAO IMPROV,_M,.~T.. ~- .A,u. NO. to OENlO/t CRE[K [STP~ATCD COST OF A~0 ocr, REOUt-STED ~trOlAN DF'NIN~ Nn~:F~ OF PARKWAY ' ~T.~ J OLmANKITY IINIT PRICE I AMOUNT I :T.~' , OFSCRIPTION I ~ p~aSE glo 6 LANE PAVEMCNI I ~ J '~ jDlace Topsoil - M~dian (6' thick) ISY !~ ',~ro~:x:~st Srcding (Ccnmon 264 JLim~ ~l~rr~', ly A.. 5~ ~2.5 ~/~y 25,1. ) )' 'i~ slurry, ly A.. 5~ 34 ~/sy Iq' Thick) ION ~h0.2 ',A' Mor;olithic Curb (~000 p~i) 530.1 j 6' cC;~C. (0rive',ay~ & Meal(m, No~e~) AY 672 [6'~6" .Jiggl~ Bar (rpf Si6.I ) 4' Tr,]ffic Button, White(Non Nefl.)(P t4'1) lEA ~76.2 14' ~r~fflc DuLtoD. Nhite(sinq. Refl. J~P I%U) EA 6)%) ) 2" PVC conduit (Sch. :0) )LF ~.!0,.' : )' PVC conduit (Sch. -592 *.1 I? S0.42 tl 05 .$67.00 $6).00 $ij.68 )1.00 $24.00 $$.00 52 00 th.0g $2.40 ~3.00 $i77.Q0 DRAFT ($296.00)1 (565.35 5214.20 $t89.00 $?.J73.52 ($116.00)J $1,2~2.00 $,oo,oo ((96.00)I $336.00 $254 O0 SUB [nTAL 305.33 _hui'~ELPING, r-- :mAdg TOIAL Eo, .MAT.L, ,.GOT $9?? 06 $10.747.66