Loading...
ST8402-CS 890421 (2)April 21, 1989 ENTERPRISES. INC. APR,2' Mr. John Karlsruher, Project Engineer Ginn & Associates 17103 Preston Road, Suite 100 Dallas, Texas 75248 RE: Beltline 4.8 Venture Tract Dear John: When do you expect final grading to occur along Denton,Ta Road in front of our 4.8 acre site, so that we have slope minimum from top of curb back westerly~ property? We appreciate the construction crew putting the fen¢ up along the front property boundary, if only basis. After final grading, we would expect'~'th( 'corner posts to be "reset" in concrete and~'weld, posts replaced as existed prior to the corner posts has been damaged severely- ~ salvageable; the other appears to be reuseable.'/Af.~! corner posts are reset and welded, they will need to be painted to match existing fence ar wire "restretched." You will recall the problems we have had in~th~ this particular site from unauthorized dumpin sooner the fence is restored the sooner we can continuation of the problem we've experienced in on this particular property. the pas' Should you have any questions or need information, please do not hesitate to call. Very truly yours, Glen A. tlinckley GAH/Jc REAL ESTATE INVESTMENTS ~: '