Loading...
PA9702-LR 990628 (2) CONCRETE COMPREb'SIVE STRENGTH TES 8901 Carp~ter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/16/1999 Report No.: 9916526 Report Date 06/28/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btainsamp~es~ffreshc~ncreteatthepla~ement~ocati~ns~perf~rmrequired~e~dtestandcast compressive strength samples. PROJECT DATA CONTI~CTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Boys pLACEMEST DATE: 06/16/1999 BATCH Tn4E: 12:40pm I, LAI, rr: Lewisville xn4~ SAMPLED: 1:50pm BY: Mike Odom SPECIFICATION REQUIREIVlENTS WEATHER CONDmONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (ID - Am 88 F CONCRETE: 89 F SLUMP: 4.0-6.0" TRUCK NO: 215 T~CKEXNO: 73580 AIR: N/A AreCONTENT(%): N/A UNrrwEIGffr(pct): N/A TEST ~u~'rUOn: ASTM C- 143 pLACEMENT LOCATION: Pier information nd technician time: See Rep~ ~9916Y~5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: RA-.5 REPORT OF TESTS ACCLrMULATIVEYARDS: 40 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 4.50 06/23/1999 7 130100 4600 1 2 4.50 06/23/1999 7 127140 4500 Average 4550 1 3 4.50 07/14/1999 28 1 4 4.50 07/14/1999 28 Technician: Mike Odom Started: N/A Finished: N/A 'nee ' Inc. Report Distribution: ( I ) City of Coppell ( 1 ) City of Coplull - Engineering (1) BlinkIcy Satgent Architects (I) City ofCoppeH - Bldg. lnsp. e liarDour (1) Turner Engineers (1) City ofCoppell - Leisure Serv Dept sident (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be nproduced except in full without the vaitt~n approval of HBC Engineering, Inc. 01TM Page 1 of I