Loading...
ST9905-CS040325 T H IE C I T Y 0 F orr rL March 25, 2004 Jim Conine, Senior Vice President Minyard Food Stores, Inc. P.O. Box 518 Coppell, Texas 75019 RE: Bethel Road I Project # ST 99-05 Parcel 8 Future Drive at West Minyard's Property Line Dear Mr. Conine: Construction of the Bethel Road I improvements is scheduled to start in October 2004. At your direction, the driveway and median opening for the future west drive extension will not be constructed with these improvements. The City has preserved the option of a median opening for the future west drive as shown on the attached schematic layout. Minyards will be allowed to construct the driveway and reconfigure the existing median when the west drive is constructed. Design of these future improvements should generally follow the dimensions as shown on the schematic layout. As previously discussed, the City has no objections to the drive being constructed across the drainage easement and the future drive will not conflict with the 5' x 10' box culverts once they are constructed. Should you have any questions or need any additional information, please feel free to give me a call. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Enclosure + z E March 24, 2004 Minyard Food Stores, Inc. Mr. Jim Conine, Senior Vice President P.O. Box 518 Coppell, Texas 75019 Bethel Road I ST 99-05 Future Drive at West Minyard's Property Line Dear Mr. Conine: Construction of the Bethel Road I improvements is scheduled to start in October 2004. At your direction, the driveway and median opening for the future west drive extension will not be constructed with these improvements. The City has preserved the option of a median opening for the future west drive as shown on the attached schematic layout. Minyards will be allowed to construct the driveway and reconfigure the existing median when the west drive is constructed. Design of these future improvements should generally follow the dimensions as shown on the schematic layout. As previously discussed, the City has no objections to the drive being constructed across the drainage easement and the future drive will not conflict with the 5' x 10' box culverts once they are constructed. We appreciate the signed easement documents. Should you have any questions or need additional information, please feel free to contact me.