ST9501-CS 950329RIGHT-OF-WAY STATUS S.H. 121 BYPASS March 10, 1995 S.H.121 Bypass: (Section 9) From Denton Creek To Denton Tap Road Outstanding Issues: 1. Parcel to be acquired: a.) b.) c.) d.) Right of Entry to appraise: Appraisal Completed: 95% Negotiation Completed: 75% E.D. Hearings: Completed 1.) Estimated to Begin: 2.) a.) Dallas County: b.) Denton County: Estimated Possession: June, 1995. June, 1995. a.) Dallas County: May, 1996. b~) Denton County: March, 1996. Utilities to be relocated: a.) b.) c.) Lone Star Gas Company (6 - 12 Months to relocate) Brazos Electrical Co-op (12 - 18 Months to relocate) Texas-New Mexico Power (6 - 12 Months to relocate) Personal Property to be relocated: a.) Estimated clearance: August 1996 Final environmental clearance: a.) Indian artifacts: A pedestrian inspection has been made. TxDOT personnel are contacting some of the property owners for right of entry to do additional investigation requiring' archeological trenching. This operation may be forced to wait until right of way is secured. Section 6: west of the Burlington Northern Railroad to East of Legacy,~4-1ane divided highway) (CSJ 0364-03-043) Completed March 29, 1994 Section 7: East of Legacy to East S.H. 289 (4-lane divided)(including the S.H. 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Project is complete and open to traffic. Section 8: S.H. 289 to U.S. 75 (4-lane divided) (CSJ 0364-04-022) On "hold" status in the 1995 PDP. The Dallas District has requested that this project be elevated to Level II authority in the 1996 PDP Update. 2. Catego.~ry 3A National Highway System Mobility· II. S.H. 121 (SPUR 553) LEWTSVTT.T.m BYPASS (STAGR T) (See attached for right of way status) A. Section 9: North of Denton Creek to Denton Tap Road (3-1~e frontage roads) (CSJ 3547-03-002 & 3547-02-003) Category 13 State Funded Mobility. The 3 year 1995 TIP does include this project in fiscal year 1996. 2. Estimated letting date is July, 1996. 3. Construction plans are 62% complete. 4. Estimated construction cost is $14,000,000. "Plans adequate" for utility adjustments are complete and TxDOT has sent these plans to the utility companies. TxDOT is waiting for the property owner of parcel 27 to provide the location of a drainage easement across his property which will take water from 121 to Denton Creek. The property owner has agreed tO donate the drainage easement as long as he gets to decide its location on his property. TxDOT and the City of Coppell are currently working on an agreement which would allow TxDOT to construct a permanent drainage structure along Denton Tap Road which would be compatible with Coppell's future Denton Tap Road construction. Without the agreement, TxDOT would provide a temporary system to transport drainage runoff from S.H. 121 to Denton Creek along Denton Tap Road which Coppell would replace with a permanent system during their Denton Tap Road construction.