Loading...
SS9901-CS040329COPPELL March 29, 2004 Mr. Todd Reck Water Resources Planning Manager City of Irving P.O. Box 152288 Irving, Texas 75015 DeForest Lift Station Improvements SS 99-01 Force Main Line "A" Dear Mr. Reck: This is a follow-up to my letter dated February 19, 2003 and our subsequent telephone conversation concerning the proposed construction of a 20-inch force main that will cross under an existing City of Irving 54-inch water line in two locations. The plan sheets that were enclosed showed the open cut/boring installation of the force main with the force main bored under the existing water line in both locations. The City does not allow wet bores and Irving will be notified at least 48-hour notice prior to construction. In June 2003, the City authorized the consultant to add an alternate construction method for the installation of the force main: directional drilling. The City awarded a construction contract for the open cut/boring installation of the force main on March 23, 2004. A pre-construction conference will be scheduled in the near future. Your consideration of this matter is appreciated. Should you have any questions or comments, or need any additional information, please contact me at 972-304-7019 Sincerely, Suza, n (~. Taylor c. IP 'Coordinator