CF-Allen Rd Park-CS040301uJ/lu/zu~q ll:bb 4bUJ/4UBll GWC ENGINEERING PAGE 03/18
~5/81/04 11:~? CITY OF COPPELL a 4G~4~811 NO.J~4 [7{)2
MEMORANDUM
FROM
ENGINEERING
To: Jolm Ktias -
l~mm; Kelth R.
I)ale: Febrmlr? 25,
RE: Allu
The ~l~ne~,t~g Department
Park Lake M~zonO
,: I, Define the Size and s
is OOnstn~cted ~
facade? How about the
3. What h~ppens ifmom of t
of the damaged facade?
4. On the Figur~ 4 repair, is
shale ,,long the bazc c
5. Is the existing stone
6. The bid is to be fca,,
· pproxim~t¢ q
type 3 turn: out to be ~
and if so, would ti~at be
7. En~ure the removal and o
from the sections to be r~
8. The con~actor mu~t arra
9. Stat~ the workil~g hours o~
10. Overtime for insp,.cfion s~
M~,onry Wall
the Project Sp~ification~ & D~ls for the Allen Ro~d
have the following comments to offer;
of the reinforcing steel to ensure the footing in Figure 3 and Figur~
made fi.om the now ~'ooti~lg to the reconsuuct~d ma~om-y
f~c~e and the intact farce to r~tin?
/hcade is damaged during Ibc ~xcavation and/or removal
reqmred to remo.ve the old mortar md/or we~lh,~l
failed facade to be r~used for ~h~ Figure
~um amount, however, in th,. surnmnry of work there ~.r~
What happens i£the Quantity of
show~ in the section? Will there be a chsng~ order,
s schedule of Yalues?
~site disposal of all ~xcavated malc~al and all excess mortar sad stone
:¢ lab testing
~i¢¢s will be chatted to the contractor. ~.~.~
'*Ci r~ I f COPP~:L I-' £/~IGIN E~RING - ~(eELLI~NCE By OF,~iGN,+
................ u¢~¢~uo~z bWU bN~INEERZNG PAGE 04/28
B3/~I/04 11=3? CITY DF CSPPELL ~ 4693T4~1~ NO,~4 ~3
11. Sc~ no~s under Section C 1510 T~mporary F~ilides.
12. E~I~n pl~ me,od
g~c i~age ~cs
1 ~. Pr~ide d~[s of ~c~ss
14. P~de d~l~
uuder Earthwork Section 02200 Paragraph 3.3. 'Ibis
"CITy t COlela EI,~L EN~I~ING. ~.~gl,bgNCg ~y DI;SlGN"