SS9901-CS040330cOp?EL
March 30, 2004
Mr. Richard Gee
GEE Consultants
10046 Monroe Drive
Dallas, Texas 75229
RE:
DeForest Road Lift Station Improvements
Force Mains Lines 'A' & 'B'
SS 99-01
Construction Materials Testing
Dear Mr. Gee:
Enclosed please find a set of plans and specifications for the above referenced project.
The project consists of the installation of_+4800 linear feet of 20-inch force main and
+900 linear feet of 30-inch force main. The construction documents provide for two
alternate construction methods: directional drilling and open cut/boring. The City of
Coppell awarded a construction contract for Alternate I1, open cut/boring, on March 23,
2004.
Please provide an estimate of the type and number of construction materials tests required
for the project based on the construction plans and the City's standards and submit a
proposal for the testing. We also want to review a copy of your standard invoice
submittal so that we can request any changes prior to starting the testing. The contractor
is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m.
Your consideration of this matter is appreciated and should you have any questions or
need any additional information, please contact me at 972-304-7019.
Sincerely,
SuzaE ~. Taylor
C.I.P. Coordinator
Attachments