CF-Denton Creek Trail-LR040320TEAM Consultants, Inc.
Geotechnical, Environmental, Construction Materials Testing
CONCRETE STRENGTH REPORT
(ASTM C-39), (ASTM C-78), (ASTM C-298) OR (TEX-418-A), (TEX-448-A)
Mr. Steve Jeske DATE: 03/20/2004 REPORT NO.: 4-5446
Jeske Construction Company JOB NO.: 035225
P.O. Box 59025
Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor
Hike and Bike Trail
Cyl or
Beam Date
No. Location Break
15- A Andy Brown West Park, 02/23
B west of Denton Tap bridge 02/23
C joggers trail, runs under 03/15
D bridge 03/15
16- A Jogging trail, Sta. 4+89 02/27
B 02/27
C 03/19
D 03/19
Slump(in.) Air (%) Strength (psi)
Date ASTM AST~'[ 28-Day
Made (C-143) (C-231) 7-Day 28-Da¥ Specs.
02/16 4.25 2.1. (3600) --
02/16 (3580~
02/16
02/16
02/20 4.50 3.3 (2550]'~'~'~--
02/20 (27~
02/20
02/20
REMARKS:
Conical fracture on cylinders unless otherwise noted.
Cylinder diameter 6.00" unless otherwise noted.
Area of cylinder 28.27 sq. in. tmless otherwise noted.
lrf
cc: City of CoppelI Parks/John Elias
City of Coppell Parks/Larry Davis
TBG Partners/Tom Woliver
By:
TEAM Consultants, Inc.
Tin~{y Woolly
2970 S. Walton Walker Suite ]Ol Dallas. TX 75211 (2]4) 3314395 Fax (214) 331-4458
3101 Pleasant Valle)'. Suite lOI Arlington. %Y 76015 (8]7) 467-5500 Fax (817) 468-9920