Loading...
CF-Denton Creek Trail-LR040320TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C-39), (ASTM C-78), (ASTM C-298) OR (TEX-418-A), (TEX-448-A) Mr. Steve Jeske DATE: 03/20/2004 REPORT NO.: 4-5446 Jeske Construction Company JOB NO.: 035225 P.O. Box 59025 Dallas, TX 75229 PROJECT: Denton Creek/Ashbury Manor Hike and Bike Trail Cyl or Beam Date No. Location Break 15- A Andy Brown West Park, 02/23 B west of Denton Tap bridge 02/23 C joggers trail, runs under 03/15 D bridge 03/15 16- A Jogging trail, Sta. 4+89 02/27 B 02/27 C 03/19 D 03/19 Slump(in.) Air (%) Strength (psi) Date ASTM AST~'[ 28-Day Made (C-143) (C-231) 7-Day 28-Da¥ Specs. 02/16 4.25 2.1. (3600) -- 02/16 (3580~ 02/16 02/16 02/20 4.50 3.3 (2550]'~'~'~-- 02/20 (27~ 02/20 02/20 REMARKS: Conical fracture on cylinders unless otherwise noted. Cylinder diameter 6.00" unless otherwise noted. Area of cylinder 28.27 sq. in. tmless otherwise noted. lrf cc: City of CoppelI Parks/John Elias City of Coppell Parks/Larry Davis TBG Partners/Tom Woliver By: TEAM Consultants, Inc. Tin~{y Woolly 2970 S. Walton Walker Suite ]Ol Dallas. TX 75211 (2]4) 3314395 Fax (214) 331-4458 3101 Pleasant Valle)'. Suite lOI Arlington. %Y 76015 (8]7) 467-5500 Fax (817) 468-9920