April 1, 2004
Mr. David Dryden
Rone Engineers
8908 Ambassador Row
Dallas, Texas 75247
Shadow Ridge Estates Retaining Wall
DR 03-01
Construction Materials Testing
Dear Mr. Dryden:
Enclosed please find a set of plans and specifications for the above referenced project.
The project consists of the installation of approximately 230 linear feet of a pier-founded,
tieback, gabion retaining wall. The retaining wall consists of 102 vertical feet of 18-inch
diameter reinforced concrete piers, 23 cubic yards of reinforced concrete beam, 17
passive soil anchors, and 155 cubic yards of 3'x 3' PVC coated gabions. It is anticipated
that construction will begin in May 2004.
Please provide an estimate of the type and number of construction materials tests required
for the project based on the construction plans and the City's standards and submit a
proposal for the testing, The contractor is responsible for payment of materials testing
done before 8:00 a.m. and after 5:00 p.m
Your consideration of this matter is appreciated and should you have any questions or
need any additional information, please contact me at 972-304-7019.
Sincerely,
SuzanC~Taylor
C.I.P.C'oordinator
Enclosures