Loading...
DR0301-CS040401T H £ , C I T Y . 0 F COl'FELL April 1, 2004 Mr. David Dryden Rone Engineers 8908 Ambassador Row Dallas, Texas 75247 Shadow Ridge Estates Retaining Wall DR 03-01 Construction Materials Testing Dear Mr. Dryden: Enclosed please find a set of plans and specifications for the above referenced project. The project consists of the installation of approximately 230 linear feet of a pier-founded, tieback, gabion retaining wall. The retaining wall consists of 102 vertical feet of 18-inch diameter reinforced concrete piers, 23 cubic yards of reinforced concrete beam, 17 passive soil anchors, and 155 cubic yards of 3'x 3' PVC coated gabions. It is anticipated that construction will begin in May 2004. Please provide an estimate of the type and number of construction materials tests required for the project based on the construction plans and the City's standards and submit a proposal for the testing, The contractor is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, SuzanC~Taylor C.I.P.C'oordinator Enclosures 255 pARKWAY Sr P O [3OX 947t~ ~ COPPELL TX 7B019 ~ TEL 972/462 0022 ~- FAX 9721304 3673