Loading...
ST0301-CS040401, Suzan T~ylor: R~: T~ffic~ign~i~ ' - Page 1 i From: Per Birdsall To: Suzan Taylor Date: 4/1/2004 12:37:02 PM Subject: Re: Traffic Signals O? -0l We did not particularly use Txdot specs. The poles were a main difference. We made an exception on the poles at Natches Trace due to delivery time. The poles there are txdot spec. I do not have a set of Txdot specs to reference the list of specs you sent to verify their compatibility with current inventory, operation or improvement over previous specifications. Should I come by or are they on some website I could access? Per >>> Suzan Taylor 3/25/2004 3:57:08 PM >>> Per: Freese & Nichols is designing the Bethel Road II project. At your suggestion, I sent them the Natches Trace signal plans for reference in their design of Bethel/Coppell and Bethel/Denton Tap signals. There are some TxDOT details that are not on the Natches Trace plans that F&N wants to use. Are the following TxDOT details okay for them to use? TxDOT SP-80(1 )-96 TxDOT SP-80(2)-97 TS-FD-99 TS-CF ED(4)-03 ED(7)-03 Thanks