Loading...
PA9702-LR 990719 CONCRETE COMPRE SIVE STRENGTH TES't 8901 Carpenter Frwy~ Suite #109 Dallal; Tell! 75247 Date of Service: 06/16/1999 Report No.: 9916526 Report Date 07/1911999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~}Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. ~a)6051 Services: ~btainsamp~es~ffreshc~ncreteatthep~a~ement~ocati~ns~pe~~rmrequired~e~dtestandcast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRt'TE CLASS: 6 Sack COSCR~,-tV.;SUPPtmR: Nelson Boys PLACEMENT DATE: 06/16/1999 BATCh TIME: 12:40pro ~,12,tcr: Lewisville TIME SAMPLEO: 1:50pm BY: Mike Odom SPECIFICATION REQUIREMERrS WEATHER CONDmOSS: Partly cloudy STRENGTU: 4000 psi @ 28 Days TEMPERATURE (F)- Am 88 V CONCRETE: 89 V sLtn~w: 4.0-6.0" TRUCK NO: 215 TXCKETNO: 73580 Am: N/A AreCONTENT(%): N/A olvrrvai:mwr(.,~: N/A TEST METHOD: AST1V[ C- 143 etACEMENT LOCATION: Pier information and technician time: See Report#9916525 ASTM C-172 ASTM C-39 SAMPLE LOCATION: RA-.5 REPORT OF TESTS Acct ctn Tn WRDS: 40 CYLINDER IVIFASURED MAXIMUM COMPRESSBrE MARKEh SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Ol~- force) (psi) TYPE 1 1 4.50 06/23/1999 7 130100 4600 1 2 4.50 06/23/1999 7 127140 4500 Average 4550 1 3 4.50 07/14/1999 28 155600 5500 1 4 4.50 07/14/1999 28 146580 5180 Average 5340 Technkian: Mike Odom Started: N/A Finished: N/A ~ ~ring, Inc. Report Distribution: (1) City of Coppcll (1) City ofCoppen - Engineering (1) BrinkIcy Sargent Architects (l) City ofCoppell - Bldg. Insp. (l)TumerEngincers (l)CityofCoppell-LcisurcServDcpt tCf,,. EugeneHarbour Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 1