SS9901-CS031215Items needed for Coppell Force Main specs Page 1 of I Paula Crocker - Fwd: Items needed for Coppell Force Main specs From: Ken Griffin To: Paula Crocker Date: 12/15/2003 11:21 AM Subject: Fwd: Items needed for Coppell Force Main specs Paula Could you handle 1-47 l'm working on 5. ken g >>> "Sugg, Ted" <ted.sugg@tcb.aecomcom> 12/15/2003 10:58:26 AM >>> Ken, We plan on plotting and sealing the final plans for the force mains this week. We need some final information to finalize the specifications. 1. Prevailing wage rates (for inclusion at the end of Section 1) 2. Bid time / date (same for Lines A&B and Line D?) 3. Bid number (Lines A&B and Line D) 4. Pre bid conference time / date (again, same for Lines A&B and Line D? site visit?) 5. Missing wordage in supplementary conditions (Section 3) item 1.24.2.1 ~ realize you may not have dates and dines yet, but if we could get the other items we can get that part of the specs finalized. Thanks Ted Sugg, P.E. Project Manager Turner Collie & Braden Inc. 17300 Dallas Parkway, Suite 1010 Dallas, Texas 75248-1145 (972) 735-3000 Fax (972) 735-3001 Direct 972-735-3048 E-Mail: ted.sugg @ tcb,aecom,com file://C:\temp\GW }00001.HTM 12/15/2003 shall replace the utilities or service lines with the same type of original constmction, or better, at his own cost and expense. If' it is necessary to change or move the properly of any owner or of a public utility, such property shall not be moved or interfered with until authorized by the ENGINEER. The right is reserved to the owner of any public utility to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by the performance of this contract. ITEM 1.22 - CONTRACTORS RESPONSIBILITIES SC-1.22,5 Amend the first sentence of Item 1.22.5 by adding the following at the beginning of the sentence: "If requested by Owner, Engineer or Contractor". ITEM 1.24 - PROTECTION OF WORK AND OF PERSONS AND PROPERTY SC-1.24.2.1 Add the following new Item 1.24.2.1 immediately after Item 1.24.2: 1.24.2.1 Should CONTRACTOR cause damage to the work or properly of any separate Contractor at the site, or should any claim arise out of CONTRACTOR, OWNER, ENGINEER, Consulting Engineer or any other person's action, CONTRACTOR shall promptly attempt to settle with such other Contractor by agreement, or to otherwise resolve the dispute by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold OWNER, ENGINEER and Consulting Engineer harmless from and against all claims, damages, losses and expenses (including, but not limited to, fees of engineers, architects, attorneys and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any separate Contractor against OWNER, ENGINEER or Consulting Engineer to the extent based on a claim arising out of CONTRACTOR'S performance of the Work. Should a separate Contractor cause damage to the work or property of CONTRACTOR or should the performance of work be any separate Contractor at the site give rise to any other claim, CONTRACTOR shall not institute any action, legal or equitable, against OWNER, ENGINEER or Consulting Engineer or permit any action against any of them to be maintained and continued in its name or for its benefit in any court or before any arbiter which seeks to impose liability on or to recover damages from OWNER, ENGINEER or Consulting Engineer on account of any such damage or claim. If CONTRACTOR is delayed at any time in performing or furnishing Work by any act or neglect of a separate Contractor and OWNER and CONTRACTOR are unable to agree as to the extent of any adjustment in Contract Time attributable thereto, CONTRACTOR may make a claim for an extension of time in accordance with Item 1.36. An extension of the Contract Time shall be CONTRACTOR's exclusive 34 Standard Spec!ficalions Supplementary Conditions Page I of Paula Crocker - Fwd: Items needed for Coppell Force Main From: Paula Crocker To: Ted Sugg Subject: Fwd: items needed for Coppell Force Main specs 1. Prevailing wage rates attached. 2.Bid Time/date: Force Main Line "D" Bid Opening Feb. 10, 2004 10:00 a.m. Force Main Line "A" & "B" Bid Opening Feb. 10, 2004 10:30 a.m. 3.Bid #'s "D" # Q-1203-01 "A" & "B" # Q-1203-02 4.Pre bid conference time Feb. 3rd, 2004 10:00 2nd Floor Conference Room. 5.Section 3 item 1.24.2.1. attached. about:blank 12/16/2003