SS9901-CS031215Items needed for Coppell Force Main specs Page 1 of I
Paula Crocker - Fwd: Items needed for Coppell Force Main specs
From: Ken Griffin
To: Paula Crocker
Date: 12/15/2003 11:21 AM
Subject: Fwd: Items needed for Coppell Force Main specs
Paula
Could you handle 1-47 l'm working on 5.
ken g
>>> "Sugg, Ted" <ted.sugg@tcb.aecomcom> 12/15/2003 10:58:26 AM >>>
Ken,
We plan on plotting and sealing the final plans for the force mains this week. We need some final information to
finalize the specifications.
1. Prevailing wage rates (for inclusion at the end of Section 1)
2. Bid time / date (same for Lines A&B and Line D?)
3. Bid number (Lines A&B and Line D)
4. Pre bid conference time / date (again, same for Lines A&B and Line D? site visit?)
5. Missing wordage in supplementary conditions (Section 3) item 1.24.2.1
~ realize you may not have dates and dines yet, but if we could get the other items we can get that part of the
specs finalized.
Thanks
Ted Sugg, P.E.
Project Manager
Turner Collie & Braden Inc.
17300 Dallas Parkway, Suite 1010
Dallas, Texas 75248-1145
(972) 735-3000 Fax (972) 735-3001
Direct 972-735-3048
E-Mail: ted.sugg @ tcb,aecom,com
file://C:\temp\GW }00001.HTM 12/15/2003
shall replace the utilities or service lines with the same type of original constmction, or
better, at his own cost and expense.
If' it is necessary to change or move the properly of any owner or of a public utility, such
property shall not be moved or interfered with until authorized by the ENGINEER. The
right is reserved to the owner of any public utility to enter upon the limits of the project
for the purpose of making such changes or repairs of their property that may be made
necessary by the performance of this contract.
ITEM 1.22 - CONTRACTORS RESPONSIBILITIES
SC-1.22,5
Amend the first sentence of Item 1.22.5 by adding the following at the beginning of the sentence: "If
requested by Owner, Engineer or Contractor".
ITEM 1.24 - PROTECTION OF WORK AND OF PERSONS AND PROPERTY
SC-1.24.2.1
Add the following new Item 1.24.2.1 immediately after Item 1.24.2:
1.24.2.1
Should CONTRACTOR cause damage to the work or properly of any separate Contractor
at the site, or should any claim arise out of CONTRACTOR, OWNER, ENGINEER,
Consulting Engineer or any other person's action, CONTRACTOR shall promptly
attempt to settle with such other Contractor by agreement, or to otherwise resolve the
dispute by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by
Laws and Regulations, indemnify and hold OWNER, ENGINEER and Consulting
Engineer harmless from and against all claims, damages, losses and expenses (including,
but not limited to, fees of engineers, architects, attorneys and other professionals and court
and arbitration costs) arising directly, indirectly or consequentially out of any action, legal
or equitable, brought by any separate Contractor against OWNER, ENGINEER or
Consulting Engineer to the extent based on a claim arising out of CONTRACTOR'S
performance of the Work. Should a separate Contractor cause damage to the work or
property of CONTRACTOR or should the performance of work be any separate
Contractor at the site give rise to any other claim, CONTRACTOR shall not institute any
action, legal or equitable, against OWNER, ENGINEER or Consulting Engineer or permit
any action against any of them to be maintained and continued in its name or for its
benefit in any court or before any arbiter which seeks to impose liability on or to recover
damages from OWNER, ENGINEER or Consulting Engineer on account of any such
damage or claim. If CONTRACTOR is delayed at any time in performing or furnishing
Work by any act or neglect of a separate Contractor and OWNER and CONTRACTOR
are unable to agree as to the extent of any adjustment in Contract Time attributable
thereto, CONTRACTOR may make a claim for an extension of time in accordance with
Item 1.36. An extension of the Contract Time shall be CONTRACTOR's exclusive
34
Standard Spec!ficalions
Supplementary Conditions
Page I of
Paula Crocker - Fwd: Items needed for Coppell Force Main
From: Paula Crocker
To: Ted Sugg
Subject: Fwd: items needed for Coppell Force Main specs
1. Prevailing wage rates attached.
2.Bid Time/date:
Force Main Line "D" Bid Opening Feb. 10, 2004 10:00 a.m.
Force Main Line "A" & "B" Bid Opening Feb. 10, 2004 10:30 a.m.
3.Bid #'s "D" # Q-1203-01
"A" & "B" # Q-1203-02
4.Pre bid conference time Feb. 3rd, 2004 10:00 2nd Floor Conference Room.
5.Section 3 item 1.24.2.1. attached.
about:blank 12/16/2003