Loading...
WA0003-CS040304BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 Dallas, Texas 75231 Fax (214) 361-0204 t.O& OO-03 Ph0ne(214)361-7900 FAX TRANSMISSION COVER SHEET Fax Number: Number of Pages Transmitted (including this one) 2 From: Gary C. Hendricks, P.E. Date: March 4, 2004 To: Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppeii P. O. Box 478 Coppell, Texas 75019 Ken: Thanks for contacting me recently regarding our meeting scheduled for next week. I enjoyed visiting with you and catching up on your family happenings. During our conversation, you mentioned that you need an update as to the status of the water distribution analysis and report. I reviewed our files and find the most recent and last correspondence was a letter to you dated May 23, 2003 in which we transmitted two preliminary copies of the water system master plan report for the C~ty s rewe . To the best of our knowledge we have not received comments back from the City, nor do we have any personnel time charged to that project since then. A billing ',vas sent on August 12, 2003 for work completed through May 23, 2003. Attached is a copy of the May 23ra transmittal letter. Doug Showers will bring an additional copy of the master plan report for your review during your meeting next week. I look forward to hearing from you again soon. JOHN W. B IRK~IOFF, RONALD V. CONY/AY, P.E. GARY C, HENDEICKS, P.E. JOE R. CARTER, PAUL A. CARLINF~ P.E MATT HICKEY, P.E. DOOGLAS K. SHOWERS, P.E. ROSS L. JACOBS, PE BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 Dallas, Texas 75233. Fax (214) 361-0204 May 23, 2003 Phone (214) 361-7900 Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer City of Coppell P. O. Box 9478 Coppell, TX 75019 Re: Water Distribution System Master Plan Preliminary Submittal Dear Mr. Griffin: We are delivering two preliminary copies of the City of Coppell Water Distribution System Master Plan Report for your review and comment. Included with the report are two copies of the Water Distribution System Master Plan Map. Please review this preliminary submittal and notify us of your findings. If this submittal is acce stable, we will deliver final documents and all applicable files at your direction. We are avai~ s this project further at your convenience. Sincerely(~ c. H / ks, Enclosures